![Galanz XQG60-A708E After-Sales Service Manual Download Page 50](http://html1.mh-extra.com/html/galanz/xqg60-a708e/xqg60-a708e_after-sales-service-manual_3239077050.webp)
XYJGT6070AQFDE-001
49
1.
拆除绑扎线束的铁
扎线
3
、
4
、
5
(沿电
机线束共有三处)
Remove the iron
binding wire
harness 3, 4 and 5
(there are three
places along the
motor wiring
harness).
2.
拔出电机线组
2
和
电机地线
1
Pull out motor wire
group 2 and motor
ground 1.
1.
铁扎线保留在原来
位置,装回机器时需
要把线束束紧
The iron binding
wire is left in its
original position and
the wire harness
needs to be
tightened when it is
installed back into
the machine.
2.
拆出的线组做好防
护措施
Protect the
removed wire.
拆除上配重块和水位开关
Remove the upper balancer and water level switch