+
H
2
O
VAC
BSP 1/2
!
Do not try to unclog any blockage
via the toilet bowl as this may
damage the flexible pipe.
Always perform unclogging by
moving the implement in the
direction of the building’s drain pipes.
Page 1: ...17751N x8 x8 Gaius Duo 17751N 5 2019 320104 20104 20108 20209 20210 20114 20127 20118 20128 M8 x 12 INST ALLA TION GUIDE ...
Page 2: ...the connection The water connection must be positioned to the right of the mid line as shown in the drawing 1 Mid line 2 Wall 3 Electrical connection 4 Water connection 5 Wall mounting fixtures 45 x 195 6 Finished floor 7 Wastewater connection on the wall Ø110 mm The pipe is cut at the level of the wall 8 Wastewater connection on the floor Ø110 mm The pipe is cut at the level of the finished floor 9 Wa...
Page 3: ...4x Motor Remote 230 V 230 V Authorised personnel only Connect electricity Affix the frame to the wall A D B C E ...
Page 4: ...Install the cistern and the water hose 2x Testing up down Mind the water pipes J H I F G 600 mm ...
Page 5: ...L1 Measure the pipes L3 L1 L2 7 L3 L2 L1 L2 L3 L1 L2 L2 L1 L3 A D B C ...
Page 6: ...Install drainage E H I F G J max 55 mm ...
Page 7: ...L1 Measure the pipes L3 65 mm L2 L2 L1 L2 L3 min 105 mm 55 mm ø 110 ø 90 50 mm L2 L2 A D B C E ø 90 ...
Page 8: ...min 88 mm J H I F G ...
Page 9: ...L x8 x8 2 1 3 Mount the cover seat and support rails A D B C x8 ...
Page 10: ... CLICK CLICK Mount the toilet roll holder remote control and push button 0mm 90 2 3 2 x E F CLICK G H G J K L I ...
Page 11: ...H2 O VAC BSP 1 2 Do not try to unclog any blockage via the toilet bowl as this may damage the flexible pipe Always perform unclogging by moving the implement in the direction of the building s drain pipes ...