GS2K-SKB-HW-UG-001278, Release 1.0
27
Chapter 2 Setting Up the Starter Kit Board
This chapter introduces the tasks that are typically required to setting up the GainSpan
®
GS2200M based Starter Kit Board. You can begin the setup process as soon as the site
preparation is complete and the board is unpacked and inspected.
Refer to
Appendix A GS2200M Starter Kit Board Specifications, page 37
in this manual
regarding electrical and environmental requirements.
The following sections are covered in this chapter:
•
Preparing for Starter Kit Board Setup, page 27
•
Setting Up the GS2200M Based Starter Kit Board, page 30
•
Power Guidelines, Requirements, and Safety Specifications, page 31
2.1 Preparing for Starter Kit Board Setup
This section describes how to prepare for setting up the GS2200M based SKB. It discusses
the following topics:
•
•
Safety Guidelines and Standards, page 28
•
Environmental Requirements, page 28
•
Unpacking and Inspecting the GS2200 Based Starter Kit Board, page 29
•
Placing the GS2200 SKB on a Tabletop, page 30
•
Electrical Guidelines, page 31
•