32
Installation
The extractor hood is designed for installation on
the kitchen ceiling or on a rigid suspended ceiling.
•
During installation, optional accessories may
also require fitting.
•
Observe the minimum distance between hob
and extractor hood (see ”Safety instructions”)!
•
Avoid damaging the sensitive surfaces!
Preparing the ceiling
몇
RISK OF INJURY,
DAMAGE TO PROPERT Y
Before drilling the holes for the designated
installation location, check for concealed electrical
cables and other lines.
•
The ceiling must be level and horizontal.
•
The enclosed screws and wall plugs are
suitable for concrete and natural stone. Use the
appropriate fasteners for other ceiling
structures.
Ensure that the ceiling has adequate load
bearing capacity.
•
Ensure that the depth of the drilled holes
corresponds with the length of the screws.
•
Ensure that the wall plugs are secure.
Max. weight : 50 kg.
Design subject to modification in line with technical
development.
Installing the upper support frame
1
Specify the total height of the support frame
before installation and mark the screw holes.
The height of the support frame can be
adjusted in 20 mm steps.
The total height is measured from the height of
the ceiling, the height of the worktop and the
corresponding distances between the hob and
extractor hood.
2
On the ceiling mark the centre point of the
extractor hood.
3
Using the enclosed template, mark the
positions for the screws on the ceiling.
4
Drill 4x 8 Ø mm holes and press in wall plugs
flush with the ceiling.
5
Attach the upper part of the support frame to
the ceiling with 4 screws.
6
Ensure that the support frame is in the correct
position. The middle bracket defines the
preferred side. It must be facing the hob
control.