ENGLISH
9
avoid bumps or overturnings.
5.2
Checking the machine on delivery
On delivery check with attention that the package and the machine are not damaged. In
the event that the machine has suffered any damages, report so to the carrier; before
accepting the goods, reserve by written the right to present a claim for the refund of the
damages.
5.3 Unpacking
IMPORTANT
On unpacking the machine, the operator must be provided with the necessary
accessories (e.g. gloves, protective goggles etc.) to limit possible hazards of
accidents.
Unpack the machine in the following way:
Cut and remove the plastic straps with scissors or nippers;
Remove the packaging;
Remove the bags included in the packaging and check the contents:
-
Guarantee slip;
-
Use and maintenance manual;
-
3 x Battery bridges with terminals;
-
1 x connector for the battery-charger
-
2 switch keys;
i INFORMATION
Keep one of the 2 keys safe so that it can be located in case the other one is lost;
the other key is to be inserted in the lock on the mushroom switch.
Depending on the model, remove the metal brackets or cut the plastic straps, which
fix the machine chassis to the pallet;
Using a sloping ramp, push the machine backwards off the pallet;
Unpack the brushes and squeegees;
Clean the outside of the machine observing the safety rules;
Once the machine is clear of the packaging, the batteries can be installed.
If necessary, preserve the wrapping material as it could be used again to protect the
machine in the event of a move or if the machine should be sent to a service centre for
repair.
Otherwise, the material must be disposed of in compliance with the laws in force.
!
DANGER
Failure to observe these instructions could cause possibly serious damage to
people and things and invalidates the guarantee.
5.4 Feeding
batteries
Two different batteries can be fitted on this machine:
Tubular leak-proof batteries
: these batteries require the periodical check of the
electrolyte level. When it is necessary, top up with distilled water alone until the plates
are covered; do not overfill (max. 5 mm. above the plates).
Gel batteries
: this kind of batteries requires no maintenance.
The technical specifications must correspond to those indicated in the paragraph
concerning the machine technical data: actually, the use of heavier storage batteries can
cause serious problems to the machine controllability and overheat the drive motor,
Summary of Contents for GT85 Series
Page 1: ...Automatic Scrubber OPERATOR S MANUAL GT 85...
Page 2: ......
Page 5: ...Machine Dimensions X Y Z See table TECHNICAL SPECIFICATIONS X Y Z Y X Z...
Page 6: ...A 4 5 1 6 9 2 B 3 4 5 6 1 8 7 3 8 10 2 7 9 10...
Page 7: ...C 1 2 D E F 3 1 2 3 1 4 2 3...
Page 8: ...I G 1 2 2 1 H...
Page 9: ...L 1 J...
Page 10: ...M...
Page 11: ...ENGLISH...
Page 35: ......
Page 37: ...3 9 3 18 9 3 1 18 9 3 2 18 9 3 3 18 10 19 10 1 19 10 2 21 10 3 22...
Page 38: ...4 2 2 1 2 3 i 1 2 3...
Page 39: ...5 2 2 2 3 EC 3 3 1 3 2 B B 1 B 2 B 3 B 4 B 5 B 6 C 1 C 2 E 4 3 3 A B C D E F...
Page 40: ...6 G 3 4 4 4 1 4 C 35 C 0 C 50 C 30 95 2...
Page 41: ...7 10 WEEE 2002 96 CE WEEE...
Page 42: ...8 5 5 1 EC Directive 2006 42 5 2 5 3 x3 x 1 x 2 i 5 4...
Page 44: ...10 5 6 D 7 B 10 8 5 4 3 0 5 5 5 5 1 24V 25A AGM 5 5 2 13 mm 5 6...
Page 46: ...12 A 1 A 8 LED A 10 B 7 A 10 6 4 M A 1 A 8 LED A 7 6 5 6 6 B 2 C 3 B 1 5 cm A 8 B 6 E 1 i...
Page 48: ...14 B 7 A 8 2 F 2 A 1 OFF 6 8 6 8 1 6 8 2 6 9 A 6 A 1 B 9 B 2...
Page 49: ...15 B 8 B 9 B 2 G 1 6 10 A 1 L 1 L 1 i 7 8...
Page 50: ...16 8 1 A 1 E 4 F 1 45 C 9...
Page 52: ...18 J 3 J 2 6 2 9 3 9 3 1 9 3 2 C 3 9 3 3...
Page 53: ...19 10 10 1 A 10 A 10 H 2 F 2 F 2 10 3 A 10 A 10 100 20 30...
Page 54: ...20 2 14V 10 1 10 5 100Ah 5 10A 2 14 V 2 14 V 6 12 V...
Page 55: ...21 10 2 GADLEE GREEN GT115 1 00 XX X V XXXX XX 1 XXX EASE...
Page 57: ......
Page 58: ......
Page 59: ......