![GAAM Quenchmaster CP500 Manual For Installation, Operation & Maintenance Download Page 12](http://html1.mh-extra.com/html/gaam/quenchmaster-cp500/quenchmaster-cp500_manual-for-installation-operation-and-maintenance_555607012.webp)
Quenchmaster CP500 RFS Rev4, 16/2/2010
Page
12 of 16
Attach other end to tailpiece marked (3) Foam metering valve on the foam unit.
Remove the protective covering from the ‘Scotch’ tape on the back of the face plate.
Place the face plate over the metering valve spindles and carefully aligning the lower edge of
the face plate with the bottom edge of the control panel, press into place.
NOTE
Accuracy is essential in locating the face plate on the control panel.
Place the metering valve knobs on the valve stems, ensuring that the brass spacer washers are
retained and secure with the screws supplied.
_________________________________________________________________
FITTING
INSTRUCTIONS
MODEL
CP500
2V/FV/Y
_________________________________________________________________
NOTES
If the operation of this foam Proportioner requires any lengthy period of nozzle shut-down, a
full flow check valve should be installed in the suction line, to prevent any possibility of back
flow of foam mixture into the water tank.