Information in this document can be modified without notice.
Edition 07.2020
03.5.3
03
5
Quick Start Guide
Door Multi-point Locking System І Automatic Smart Access Controlled
Door manufacturer
1. Make sure you can manually open and close the door from the interior using either the profile cylinder
knob, or interior operating handle before installing the access control system
2. Follow the correct wire diagram from this document
3. After installing the access control system,
make sure to test the system before shipping
it to site:
- Connect a 24V DC power supply to the system
- Press the buttons 0 + OK on the remote or 0 + on the keypad
- If using a Secure Connect, try activating the lock by bridging V4/93 on Secure Connect 200R
- Check that the three LED (green/blue/red) are lit up on the keypad/fingerprint scanner
4. Identify all the outside wiring before shipping it to site
(Wiring that will be connected to power supply or any 3rd party access control on site)
5. If a third party is doing the installation of the door or the access control system,
make sure to send this document
Door installer
6. After the installation of the door, the outside wiring needs to be accessible for
the access control installer to complete the job
7. The insulation foam must not cover the Secure Connect 200R
Access control installer
8. Follow the correct installation diagram from this document
9. Power supply used must be stabilized 24V DC with minimum 1,3A
Any difference in voltage may cause
malfunction and damage the system!
* Do not install the SECUREconnect if conditions require a higher protection class than IP 40