1
2
3
4
5
Z02
Z02
Z02
J06
J02R/L
J05
J06
J06
J07
J08
Z01
52
6
2
Downpipe Assembly
Fill the joining gaps in the
aluminum sections with
Silicone to avoid any leaks.
If you wish to eliminate leaks
use glue when fixing the
downpipe bends (not provided).
Drill a hole in L01A and L01B,
approximately 3mm diameter and 700mm
up from the bottom. Fix the J08 downpipe
bracket with Z01 screws and then clip
the J06 downpipe into the J08 bracket.
(not provided).