background image

INSTALL NOTE: 

A-NK6

LANDSCAPE & ARCHITECTURAL LIGHTING

   |   Learn more. Visit fxl.com

3. Product Installation (cont.)

2.  Run conduit and/or wiring (code dependent) 

to the ideal “knockout(s)” in the construction 
sleeve. 

3.  Use a tool of choice to forcefully remove the  

knockout. 

4.  Connect the conduit/wire runs to the sleeve 

with couplings of choice (1/2"-14 NPT). 

5.  Attach the sleeve cover to protect the interior 

during wall finishing using included fasteners. 

6.  Remove the sleeve cover to resume installation.  
7.  Connect wiring from housing assembly to the  

incoming power lines using the wiring diagram 
(see previous section) and approved wire 
connectors. 

8.  Insert the complete housing assembly into the  

construction sleeve.

9.  Place the housing inside the sleeve and fasten 

the screws through the center slots on the left 
and right sides. Before fully tightening, rotate 
the housing according to the level for ideal 
installation.

Summary of Contents for A-NK6

Page 1: ...damaged components may cause an unsafe condition and void the product warranty Do not block light emanating from the product in whole or part Never operate the fixture with a missing or damaged lens The lens must be cleaned on a regular basis The entire fixture may become extremely hot Do not touch the hot lens or fixture body Do not touch the light source at any time Keep all gaskets and sealing ...

Page 2: ...nockout x3 5 3 135 mm Tools Needed 7 64 Allen key installation 3 Phillips screwdriver installation 1 2 Phillips screwdriver servicing Standard Voltage SV Universal Voltage UV High Voltage HV Input Power 120V 110V to 277V 220V to 240V Dimming Phase 0 10V N A Number of Wires 3 5 3 Black White Green Black White Green Purple Gray Brown Blue Green Yellow Power Requirements ...

Page 3: ... studs For lighting in the downward direction ensure the arrow in the sleeve is pointing upward Wiring Chart North America Wiring Chart International Black Line Hot Switching White Common Green via stud or green lead Ground Gray 0 10V Purple 0 10V FIXTURE FIXTURE BUILDING BUILDING For use with 0 10V driver only For use with 0 10V driver only Front View 3 4 View Brown Line Hot Switching Blue Common...

Page 4: ...the sleeve cover to protect the interior during wall finishing using included fasteners 6 Remove the sleeve cover to resume installation 7 Connect wiring from housing assembly to the incoming power lines using the wiring diagram see previous section and approved wire connectors 8 Insert the complete housing assembly into the construction sleeve 9 Place the housing inside the sleeve and fasten the ...

Page 5: ...he warranty period contact the local authorized manufacturer s representative Hunter s obligation to repair or replace its products as set forth above is the sole and exclusive warranty set forth by Hunter There are no other warranties expressed or implied including warranties of merchantability and fitness for a particular purpose Hunter will not be liable to distributor or any other party in str...

Reviews: