FWB multiBALL Setup Manual Download Page 11

Step 8 

Mount Covers

Carefully slide on the covers and avoid pinching or bending 
the sensor cables! 
If using an electric drill, make sure not to damage the white 
surface of the wall!

Labels match the ones on the Light Bars. 
Use silver bolts provided. 
Once covers are on, repeat Step 7 „Calibrate LVX“

CV1

CV3

CV10

CV9

CV2

CV8

CV7

CV6

CV4

CV5

Description

Sticker

MB Cover Top Left

CV1

MB Cover Top Centre

CV2

MB Cover Top Right

CV3

MB Cover Rightside Up

CV4

MB Cover Rightside Down

CV5

MB Cover Bottom Right

CV6

MB Cover Bottom Centre

CV7

MB Cover Bottom Left

CV8

MB Cover Leftside Down

CV9

MB Cover Lefttside Up

CV10

Summary of Contents for multiBALL

Page 1: ...Setup Guide Fun With Balls GmbH...

Page 2: ...What s inside the box Frame x10 Light Bar x10 Cover x10 Sensor Cable x4 Light Bar Bolt M2 x40 Cover Bolt M6 x40 Speaker Box with Processing Unit...

Page 3: ...Recommended Equipment Rolling Sca olding Spirit Level Impact Drill Allen Key Set...

Page 4: ...cription Sticker MB Frame Top Left FR1 MB Frame Top Middle FR2 MB Frame Top Right FR3 MB Frame Rightside Up FR4 MB Frame Rightside Down FR5 MB Frame Bottom Right FR6 MB Frame Bottom Middle FR7 MB Fram...

Page 5: ...top screw for each profile to hold it in place 3 top try if the distance to the sides is correct and the top fits then fix all top screws and last the remaining screws for the sides Please make sure...

Page 6: ...al bolt adhesive is recommended Red Surface Cables LS1 LS3 LS4 LS5 LS2 LR1 LR2 LR3 LR4 LR5 Description Sticker MB Lightbar Top Left LS1 MB Lightbar Top Centre LS2 MB Lightbar Top Right LS3 MB Lightbar...

Page 7: ...Step 4 Open multiBALL Console Remove the 8 small bolts holding the cover Carefully lift up the cover and make sure you disconnect the speaker cables 2x 2x 2x 2x...

Page 8: ...Step 5 Mount multiBALL Console ca 5cm Use this step to connect the LAN HDMI and Power Cables...

Page 9: ...nd screwing them tight TXZS1 TXES1 TXZS2 TXZS3 TXES2 Lvx X Lvx Y TOP Computer Power Power CAN RS232 COM 1 HDMI Projector LAN HDMI HDMI RXZS3 RXES2 RXZS1 RXZS2 RXES1 Calibration of the light grid Befor...

Page 10: ...both LVX with a small screw driver 4 Power ON the LVX s re connect plug 5 Check if both green and orange lights on the LVX s are ON 6 Touch the wall between the light bars the green light should go OF...

Page 11: ...the Light Bars Use silver bolts provided Once covers are on repeat Step 7 Calibrate LVX CV1 CV3 CV10 CV9 CV2 CV8 CV7 CV6 CV4 CV5 Description Sticker MB Cover Top Left CV1 MB Cover Top Centre CV2 MB Co...

Page 12: ...iBALL system If the game does not fit in the visible picture get in touch with us so we can remotely change the settings Using Shift and Corner Correction on your projector align the picture so it per...

Page 13: ...unt multiBALL Console cover Don t forget to re connect the speaker cables Use this step to adjust the volume of the amplifier The volume can also be adjusted in the menu so try to find the best level...

Page 14: ...t to re connect the speaker cables Use this step to adjust the volume of the amplifier The volume can also be adjusted in the menu so try to find the best level suitable for you Vacuum Light Bars once...

Page 15: ...Thank you FWB Team...

Reviews: