![FWB interactiveRACQUETBALL Installation Manual Download Page 4](http://html1.mh-extra.com/html/fwb/interactiveracquetball/interactiveracquetball_installation-manual_2352725004.webp)
Required court properties to install interactiveRACQUETBALL:
Requirements:
1.
Dedicated Power Outlet
Active Internet Connection
2.
Console Mounting Space
Ceiling Load-Bearing 100kg/220lbs
or Stand Load-Bearing 100kg/220lbs
3.
Floor and Ceiling Spaces to
integrate the Sensor Bars
4.
Cable Ducts
5.
Wall Spaces for Cameras
1
2
3
4
5
1. Hardware:
4
3
5
5
5
4
4
4
4
4
Fun With Balls GmbH, 2020 ©