RECESS MOUNT INSTRUCTIONS
NOTE: Rough opening is not an exact measurement. The extra space allows cabinet to be inserted into the opening. Add
shims to level and tighten space if necessary. Additional framing might be required.
配
I I
NOTE: Before cutting the rough opening,check for pipes, electrical
cables, or heatingducts. If it is required to remove part of stud,
make sure that the wall is not a load bearing wall.
Prepare the opening in the wall for the cabinet body. Make sure
that there is support on both sides of the opening to attach the
cabinet body , as shown.
NOTE:
The cabinet height should be a minimum 2 in. above
faucet.
H
、-
配
Position the cabinet body in the rough wall opening. Make sure that the cabinet body flange
covers the wall opening uniformly.
Secure both sides of the cabinet body to the wall supports using mounting screws .
NOTE:
The cabinet body must be level for the door to work properly.