In
st
al
la
ti
o
n
:
S
ta
ge
1
Page 5 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
MLI - Inverted Heavy Duty Lift Mechanism
Before you Start
Check the Operation of the Mechanism.
Firstly, remove all the red cable ties which keep the mechanism safe and secure during
transit. There are usually 6 ties in the locations circled on the image.
However, on some models there may be more than 6 cable ties.
Once they have all been removed, the mechanism can be powered up and tested.
Connect the supplied IR remote and check that the mechanism operates correctly before
continuing with the installation.