background image

In

st

al

la

ti

o

n

S

ta

ge

 1

 

Page 5 of 20 // email [email protected]  tel: +44 (0) 1438 833577  fax: +44 (0) 1438 833565

MLI - Inverted Heavy Duty Lift Mechanism 

Before you Start

Check the Operation of the Mechanism.
Firstly, remove all the red cable ties which keep the mechanism safe and secure during
transit. There are usually 6 ties in the locations circled on the image.
However, on some models there may be more than 6 cable ties.
Once  they have all been removed,  the mechanism can be powered up and tested.
Connect the supplied IR remote and check that the mechanism operates correctly before
continuing with the installation.

Summary of Contents for MLI

Page 1: ...tyLiftMechanism Design Highlights Unique Lift and Roll Flap Mechanism Hand Made Quality Construction Full Cable Management Custom Sized to Suit Exact Size of Screen Range of Add On Functions Available...

Page 2: ...can result in serious personal injury or damage to equipment Future Sound Vision trading as Future Automation intend to make this and all documentation as accurate as possible However Future Automati...

Page 3: ...ism 6 Stage 3 Fixing the Lift to the Cabinet 7 Stage 4 Adjusting the Down Stop Position 8 Stage 5 Positioning the Cover Infill Panel 9 Stage 6 Adjusting the Flap Down Position 10 Stage 7 Adjusting the...

Page 4: ...or otherwise or service modification by persons not authorised by Future Automation or the use of any non Future Automation supplied parts Any electrical or other environmental work external to your...

Page 5: ...2 3 1 4 Nuts Bolts Multipack A range of nuts bolts washers and spacers to help add in the mounting for your screen Package Contents 1 Mechanism 1 1 Flap 1 2 Screen Mount 1 3 Cable Management 1 4 Lift...

Page 6: ...ly remove all the red cable ties which keep the mechanism safe and secure during transit There are usually 6 ties in the locations circled on the image However on some models there may be more than 6...

Page 7: ...Try to use as many self adhesive pads as possible to get the most secure fixture 4 holes to be drilled in base panel These holes should be12mm diameter to allow for adjustment later Use frame as a te...

Page 8: ...he 8 pointed screws supplied 4 on each side to pin the mechanism in place fixing its position left and right These 8 screws should be screwed through the middle hole of each of the clusters of 3 shown...

Page 9: ...77 fax 44 0 1438 833565 MLI InvertedHeavyDutyLiftMechanism Adjusting the Down Stop Position By adjusting the screw up or down you can adjust the stop drop height of the lifting beam and also the cover...

Page 10: ...Infill Panel Loosen off the frame and move the base to the centre of the opening There should be a gap of about 3mm around the edges of the base panel to the cabinet You will also have to cut a hole i...

Page 11: ...he flap CABINET BASE PLAN VIEW By loosening the M6 bolts on each side under the flap you can adjust the position of the flap in the cabinet top Aim for a 3mm gap all round CABINET BASE SIDE VIEW By wi...

Page 12: ...833577 fax 44 0 1438 833565 MLI InvertedHeavyDutyLiftMechanism By adjusting the bolts above each flap arm it is possible to alter the angle the flap opens to It is very important that when the flap is...

Page 13: ...a Group A or C framework or a VESA 200 mount Check that the type supplied suits the screen that is going to be mounted to the mechanism Group A or C Framework Remove the uprights and fix them to the b...

Page 14: ...slots in the side The inner uprights will slide to allocate different mounting systems When the screen is in position the cables can be connected and run up into the cabinet Pass the cables through t...

Page 15: ...o allow the straps to bed in and stabilise It may then be necessary to re adjust the height and or level of the lifting beam as first discussed in Stage 4 of these instructions Fix the IR Sensor and R...

Page 16: ...ators 568A 568B 1 12V SUPPLY 12V SUPPLY CURRENT LIMITED W G W O 2 12V LATCH When 12V attached device will go OUT When 12V removed device will go IN G O 3 GROUND GROUND W O W G 4 PIN 4 NOT USED BL BL 5...

Page 17: ...connector in the socket marked RS232 on the control box to operate using RS232 Details Baud rate 9600 Stop bit 1 Parity None Databits 8 Pin 1 RX Pin 6 TX Pin 3 4 GROUND Pin 2 TX Pin 3 RX Pin 5 GROUND...

Page 18: ...ler needs x2 AAA batteries which are provided within the packaging Replacing batteries Out Brings the mechanism out of the cabinet facing forward In Brings the mechanism inside the cabinet Stop Will s...

Page 19: ...ftMechanism Inverted Heavy Duty Lift Mechanism Trouble shooting guide Lift Mechanism MLI Trouble shooting For information on our products please refer to our web site www futureautomation co uk or for...

Page 20: ...0Kg 110 2lb Standard Screen Mount Colour Black Width N A Height N A Depth 155mm 6 1 Control IR Remote RF Remote Contact Closure RS232 Power Supply 240V or 110V Control Of 3rd Party Product Yes Output...

Page 21: ...Page 20 of 20 email info futureautomation co uk tel 44 0 1438 833577 fax 44 0 1438 833565 MLI InvertedHeavyDutyLiftMechanism Notes...

Page 22: ...e Automation Unit 2 Kimpton Enterprise Park Claggy Road Kimpton Hertfordshire SG4 8HP United Kingdom Tel 44 0 1438 833 577 Fax 44 0 1438 833 565 Email info futureautomation co uk www futureautomation...

Reviews: