Fusion 25075 Assembly Instructions Download Page 3

3

IN

ST

A

LL

AT

IO

N

B

A

T

TER

Y

 R

EP

LA

C

EM

EN

T

Installation (figure 2)

Step 1: 

Loosen the screws on the clamps to open.

Step 2: 

Feed 1 clamp through the opening(s) at the top of the 

support bracket and around your flag pole. Feed the 2nd clamp 

through the opening(s) at the bottom of the support bracket and 

around your flag pole. Tighten both clamps until secure.

Step 3: 

Using the adjustment dials, adjust the angle of the 

spot light and solar panel as required. Tighten to secure in the 

desired position.

  

Battery Replacement (figure 3)

Step 1: 

Move the switch to the OFF position.

Step 2: 

Open the battery compartment cover on the back of 

solar panel unit by removing the screws.

Step 3: 

Carefully lift the cover to access the battery 

compartment, being sure not to detach any of the connected 

wires.

Step 4: 

Replace battery with an equivalent new solar 

rechargeable battery, ensuring the correct polarity is observed.

Step 5: 

Reassemble the unit by reversing the above procedure.

Step 6: 

Move the switch to the ON position. Allow the unit to 

fully charge in direct sunlight for up to 2 days in the ON position. 

Once fully charged, your solar light will automatically turn on 

once it gets dark.

CAUTION: RECHARGEABLE BATTERIES CONTAIN NICKEL-

CADMIUM OR NICKEL-METAL HYDRIDE AND MUST BE 

RECYCLED OR DISPOSED OF PROPERLY. DO NOT MIX OLD 

AND NEW BATTERIES. DO NOT MIX ALKALINE, STANDARD 

(CARBON-ZINC), OR RECHARGEABLE (NI-CAD, NI-MH, 

ETC.) BATTERIES. DO NOT DISPOSE OF BATTERIES IN 

FIRE. BATTERIES MAY EXPLODE OR LEAK. THE BATTERIES 

CANNOT BE INGESTED. 

figure 2

figure 3

CLAMP

CLAMP

SUPPORT 

BRACKET 

ADJUSTMENT 

DIAL

ADJUSTMENT 

DIAL

Reviews: