FuseBox RTMA Series Instruction Leaflet Download Page 1

               

                                                    

 

After installation and testing of this product it is essential that the INSTRUCTION LEAFLET is available for reference 

 

RTMA RCBO MINI 2POLE  
Instruction Leaflet 

DOC:RCBOMINI2020

 

 
 

 

 

 

 

 

 

                                                         

 
 
 
 
 
 
 
 
 
 
 
 
 

Technical information  

 

 

 

 

 

Wiring Diagram                                                         

 

                          
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

1b   RCBO must be installed by a qualified electrician in accordance with the current IET Wiring Regulations BS 7671. 
1c    Total load must not exceed the rating of the RCBO or any additional limitation. 

 

 
2      Installation  

2a   RCBO range designed to fit FuseBox consumer units and modular enclosures. 
2b   35mm top hat din rail mounting. 
2c   Clip securely on to the din rail making sure the din rail clip at the bottom is pushed in, locking the RCBO onto the din rail, 

ensure lever is in the OFF position. 

2d     Cut, dress and connect cables as shown in the 

wiring diagram. 

         Lin (Line) terminal connect to the bus bar. 
         Neutral flying lead to the neutral terminal bar (can be cut to size to suit application). 

Connect the load to the L OUT and N OUT terminals at the top of the RCBO and the Load earth to the        
terminal bar. 

 
3     Connections 

3a     

Before powering up the circuit  check all connections are TORQUED. 

         Loose connections cause fires!!!! 

 
 
 
 

Series 

RTMA 

Rating (A) 

6, 10, 16, 20, 32, 40 

Tripping curve 

B, C 

Number of Poles 

2P 

Residual Operating Current(l

n) 

30mA 

Type 

Voltage(V) 

230V 

Frequency  

50/60Hz 

Rated short circuit capacity 

6kA 

IP RATING 

IP20

 

EN 60529 

Torque  

2.5Nm / 1.2Nm 

Maximum cable capacity 

16mm² (Lin) 10mm² (Lout Nout) 

Neutral cable length 

450mm (can be cut to suit) 

Complies with  

IEC 61009-1  
IEC 61009-2-2 

Reviews: