1. MOUNTING
1-16
1.5
Processor Unit
1.5.1
Mounting considerations
When you select a mounting location, keep in mind the following points:
• Locate the processor unit away from heat sources because of heat that can build
up inside the cabinet.
• The vibration at the mounting location should be minimum.
• Locate the equipment away from places subject to water splash and rain.
• Make the service clearance of 100 mm in front of the vent hole (left side).
• Leave sufficient space at the sides and rear of the unit to facilitate maintenance.
• Make sure that the ground wire is connected between the earth terminal on the
chassis and the ship’s earth.
• A magnetic compass will be affected if the processor unit is placed too close to the
magnetic compass. Observe the compass safe distances on page ii to prevent com-
pass malfunction.
• Do not remove the dummy plate to prevent the wrong operation of the power switch.
The items behind the plate are for use by the serviceman.
• Mount the processor unit on the floor, or on a bulkhead with the following direction
(horizontal), because of the DVD drive unit.
Keep the dummy
plate in this
position.
Processor unit, front view
OK
UP
Summary of Contents for FCR-2829W
Page 14: ...EQUIPMENT LISTS xii This page is intentionally left blank ...
Page 88: ...2 WIRING 2 54 This page is intentionally left blank ...
Page 154: ...D 1 Y Hatai ...
Page 155: ...D 2 14 Feb 2011 Y NISHIYAMA ...
Page 156: ...D 3 16 Jun 2011 Y NISHIYAMA ...
Page 157: ...D 4 Y Hatai ...
Page 158: ...May17 07 R Esumi D 5 ...
Page 159: ...13 Feb 2014 H MAKI D 6 ...
Page 160: ...D 7 24 May 2012 Y NISHIYAMA ...
Page 161: ...D 8 24 May 2012 Y NISHIYAMA ...
Page 162: ...D 9 24 May 2012 Y NISHIYAMA ...
Page 163: ...D 10 ...
Page 164: ...D 11 ...
Page 165: ...D 12 ...
Page 166: ...D 13 12 May 2015 H MAKI ...
Page 169: ...13 Jan 2012 Y NISHIYAMA 西山義浩 D 16 ...
Page 170: ...13 Jan 2012 Y NISHIYAMA D 17 ...
Page 171: ...D 18 ...