
2 - 2
6. Fold back armor by 5 mm and pass it through the two flat washers as shown in Figure 2-3.
Armor (folded back)
Gasket
Seal with putty
after tightening.
Vinyl sheath
Clamping gland
Flat
washer
Cable gland
Flat
washer
Flat
washer
Figure 2-3 Passing clamping gland, washers and gasket on the multicore cable
7. Shorten conductors considering their locations on the terminal board STB-1.
RTB-801
STB-1
Figure 2-4 Scanner unit, port side view
8. Confirm that armor is grounded between two flat washers.
9. Remove the sheath of each conductor by 6 mm. Fix crimp-on lugs (FV1.25-4, blue, ø4) to
each conductor. Make sure each connection is secure both electrically and mechanically.
10. Tighten the clamping gland.
11. Seal the cable gland with putty.
12. Connect the conductors to terminal board STB-1 referring to the interconnection diagram
on page S-1.
Summary of Contents for FAR-2835S
Page 1: ......
Page 3: ......
Page 4: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 18: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......