1.
Drill four pilot holes in the bulkhead (or tabletop) for the self-tapping screws.
2.
Screw two self-tapping screws (
5x20) into the pilot holes for upper, leave 5 mm protruding.
3.
Set unit onto the screws and fasten them.
4.
Tightly fasten the other two screws to fix the unit in place.
NOTE:
For mounting on a bulkhead, the connectors must face downward.