11
Installation
●
Once installation is complete, before final fitting check all pipe fittings for gas
leaks. Pressure the system to 13.8WCI then using a soapy solution or certified gas
leak detector to check for possible leaks. Always perform a leak test according to
the manufacturer’s instructions.
●
Slide the oven into the cabinet, then open the oven door and fix the oven with four
wood screws.
●
Pay attention to fix the oven securely.
●
Ensure the countertop, surrounding materials and bonding agents have a
temperature rating of no less than 193˚F (95˚C) to avoid deformation.
●
Turn on the power supply only after installation has been completed.
1
2
gas pipe conect hole
12V DV power connect hole
2
¾
”
(70mm)
2 ¾”
(70mm)
1 3⁄8
”
(35mm)
1
2
2”min
(51mm min)
2”min
(51mm min)
2”min
(51mm min)
23
½”
(597mm)
16
5⁄8”
(422.3mm)
23
½”
(597mm)
20
¼”
(515mm)
1
7⁄8”
(48mm)
4 ”
(102mm)