background image

Page 1

1

 of  11

Summary of Contents for California CM-BK589

Page 1: ...e of effort needed in assembling a specific product with 1 being easy and 5 being difficult For some products two persons are recommended CM BK589 2 PERSONS RECOMMENDED Tools Required For Assembly Allen Wrench Included Phillips Screwdriver Not Included For more information contact our team service ec foagroup com Rev 18 07 25 ...

Page 2: ...adjusetment knobs underneath each leg To lower or to raise each leg you need to turn clockwise or counterclockwise respectively FURNITURE OF AMERICA ALL RIGHTS RESERVED Make sure all parts are properly aligned then use the appropriate hand tool to completely tighten the bolts or screws Do not use power tools and do not overtighten Position each part correctly and insert screws or bolts into their ...

Page 3: ...l R 3 x 1pc Center End Guardail L 4 x 1pc Center End Guardail R 5 x 1pc Upper End Guardail L 6 x 1pc Upper End Guardail R 7 x 1pc Lower Front Side Rail 8 x 1pc Lower Back Side Rail 9 x 1pc Center Front Side Rail 10 x 2pcs Upper Center Back Side Rail 11 x 1pc Upper Front Side Rail 12 x 4pcs Back Guardrail 13 x 4pcs Front Guardrail 14 x 6pcs 15 x 1pc Long Ladder Rail R 16 x 1pc Long Ladder Rail L Gu...

Page 4: ...r Rail R 18 x 1pc Short Ladder Rail L 19 x 7pcs Ladder Rung 20 x 3set Twin Slat Kit Hardware List A x 36pcs B x 36pcs D x 18pcs F x 32pcs Bolt Ø1 4 x3 1 2 G x 8pcs H x 24pcs C x 14pcs Barrel Nut Ø1 4 x1 2 Wood Dowel Ø7 16 x40mm Screw 3 16 x30mm I x 1pc Allen Wrench 4mm E x 14pcs Screw Ø1 4 x2 Bolt Ø1 4 x1 9 16 Bolt Ø1 4 x1 3 16 Metal Dowel Ø3 8 x90mm J x 18pcs Hex Cap Ø1 4 x5 8 ...

Page 5: ...Page 5 of 11 1 2 3 4 6 5 7 8 9 10 10 11 13 12 12 13 14 14 14 14 15 16 19 17 18 19 20 20 20 Exploded View ...

Page 6: ...A F B I 9 4 3 10 12 A I B 13 Align side rails 7 8 to the guardrails 1 2 then secure by tightening bolts A to barrel nuts B Insert dowels F to guardrails 12 13 then align guardrails 12 13 and side rails 9 10 to end guardrails 3 4 Secure by tightening bolts A with barrel nuts B ...

Page 7: ... I B A F B I 13 12 12 Align guardrail supports 14 to the holes of the guardrails 12 13 then secure by tightening bolts D to hex cap J Insert dowels F to guardrails 12 13 then align guardrails 12 13 and side rails 10 11 to end guardrails 5 6 Secure by tightening bolts A with barrel nuts B ...

Page 8: ...s J x 9pcs 13 14 14 G G G G G G G G I D J 12 1 2 4 6 3 5 Align guardrail supports 14 to the holes of the guardrails 12 13 then secure by tightening bolts D to hex cap J Insert metal dowels G before stacking each layer of bunk beds ...

Page 9: ...11 19 16 15 E E x 10pcs 19 18 17 E x 4pcs I E I E I E I Align ladder rungs 19 to the ladder rails 15 16 then secure by using screws E Align ladder rungs 19 to the ladder rails 17 18 then secure by using screws E ...

Page 10: ...C H H 20 20 20 I 7 9 11 13 7 8 9 10 10 11 16 15 17 18 Page 10 of 11 Align longer and shorter ladders to the appropriate spot as shown in the diagram then secure by using bolts C Align slats 20 to the bunk bed then secure by using screws H ...

Page 11: ...Page 11 of 11 ...

Reviews: