1. Align the upper side rails (#3) to the indicated holes along the headboards
(#1,2), then insert 2 barrel nuts (#B) into each end with the openings facing
towards the holes. Insert 2 bolts (#A) into the holes along the headboards
(#1,2) into the barrel nuts. Secure using the Allen wrench (#C).
2. Insert a wood dowel
(#D) into the center
holes along the ends
of the front/back guard
rails (#4), then insert the
other end of the dowels
into the holes along the
headboards (#1,2). Insert
the bolts (#A) into the
holes along the head-
boards (#1,2). Secure
using the Allen wrench.
3. Align the lower side rails (#3)
to the indicated holes along the
headboards (#1,2), then insert
2 barrel nuts (#B) into each end
with the openings facing towards
the holes. Insert 2 bolts (#A)
into the holes along the head-
boards (#1,2) into the barrel nuts.
Secure using the Allen wrench.
#1
Place the twin slat kit (#5)
onto the top bed and the
full slat kit (#6) onto the
bottom bed, then insert
a screw (#E) into each
end. Secure using a
Phillips screwdriver.