FURNA E-TOP
ASSEMBLY GUIDE
Page 1: ...FURNA E TOP ASSEMBLY GUIDE ...
Page 2: ...es to hide in the space provided Unscrew 4 screws to take off cap IMPORTANT NOTE Don t tighten all screws bolts until all the pieces are completely assembled or once otherwise instructed to It is recommended that 2 people work together to complete this assembly most effectivel Two people are required to assemble and move this model 1 Pc 1 Pc 1 Pc 1 Pc 1 Pc A D B E C 1 Pc 4 Pc 18 Pc M6 x 10 3 mm 4 ...
Page 3: ... C on to the main column F K x 8 x 1 STEP 3 Two people are required to assemble and move this model Insert Part H in place around the main column where it meets the base Part B STEP 4 Use 2 x screws Part F on each to secure Part A main column at the rear Then fully tighten all 6 screw positions including the first 4 screws from Step 2 J F K ...
Page 4: ... x Part G screws to secure the desk top in place Connect power cable to power source and press UP button to put the E Top in position to complete Step 7 more easily Two people are required to assemble and move this model ...
Page 5: ... STEP 9 Part E VESA monitor mount can be assembled facing up or down for increased height range Assembly complete Touch and button to adjust height Two people are required to assemble and move this model F M ...
Page 6: ...Need help Get in touch by emailing contact furna co uk or by using our Live Chat feature on our website ...