funtec Beach Masters Set Setup Manual Download Page 2

Qu.

Description

Art.-ID

6

Plastic poles, 2 with a removable section 111414

6

Plastic connector parts

111401

2

Plastic post top parts

111402

2

Plastic base foot parts

111403

2

Elastic net centring cords

111419

4

Sand anchors

111408

4

Tension straps, 2-piece 

111407

1

Fun net, 8.5m/9.5m

111324/111322

4

Black hooks

111413

1

Beach Bag

111332

Setup Manual

Hints

 

Wipe the sand off the posts before storing them.

• Store all anchors in one single pole section so they cannot 

drop out inside the bag.

Recommendation

We recommend the Beach Masters courtline as suitable for this 

portable Beachvolleyball set. It consists of 25mm blue strapping 

with easticised corner ropes and plastic peg anchors.

Each post is assembled  from three pieces. The section 

with  the  FUNTEC  sticker  is  the  middle  piece.  The  bottom 

section  consists  of  a  larger  and  smaller  section.  You  can 

remove the short section of the post if required to reduce the 

net height to the recommended ladies height.

Assemble  the  two  parts  of  the  yellow  straps  as  shown. 

Make sure the loops are positioned at the ends of the belt 

and not near the metal clip lock. Place the small loops of the  

straps under the disks on the top of the four sand anchors.

Use two anchors per post. Make sure to knock the anchors 

into the ground at a slight angle away from the posts to aid 

tensioning.

Put the loops on the other end of the straps over the top 

end of the posts and put the posts up sloping inwards. Then 

position the cable loops attached to the top ends of the net 

over the top of the posts as well.

Elastic net centring: Connect the black elasticised cords 

at the top of the post with the red net cords at the top corners 

of the net ensuring they are under slight tension. The tension 

of the bungees will keep the net centred between the poles 

later.

Tighten  the  yellow  straps  and  adjust  the  position  of  the 

post as necessery to get the posts upright. The net should 

now align midway between the poles automatically but if not 

simply adjust the short red ropes at the top of the net to get 

it central. Adjust the lower ropes to length at the black hook 

end  and  attach  them  to  the  metal  clip  locks  on  the  yellow 

tension straps.

Parts list:

Order spare parts: [email protected]

To obtain the ideal position for the sand anchors, unfold 

the net completely  1  . The loops at the ends of the top cable 

mark the places for the posts  2  . Drive the anchors into the 

ground at a distance of approx. 3.3m from the post position 

to form an angle of approx. 45deg with the post  3  . Please 

refer to figure 8 at the bottom of this page to get an overview 

of the correct placement of posts and anchors.

The net tension and net height can be altered to achieve 

the perfect net by adjusting the tension of the ropes at the 

bottom corners of the net. 

Reviews: