funtec 111107 Setup Manual Download Page 7

1

2

Use two anchors per post. 
Make sure to knock the 
anchors into the ground at 
a slight angle away from the 
posts to aid tensioning, ideally 
using a rubber mallet.

Put the larger loops at the 
other end of the straps over 
the top end of the posts and 
put the posts up sloping 
inwards. Then put the cable 
loops attached to the top ends 
of the net over the top of the 
posts as well.

Elastic net centring: Connect 
the black elastic cords to the 
top of the post and then to 
the red net cords at the top 
corners of the net as shown. 
The tension of the bungees will 
keep the net centred between 
the poles later.

To obtain the ideal position 
for the sand anchors, unfold 
the net completely   

1  

. The 

loops at the ends of the top 
cable mark the places for the 
posts   

2

  . Drive the anchors 

into the ground at a distance 
of approx. 3 m from the post 
position   

3

   to form an approx. 

45° angle. Also refer to figure 
no. 8 to get an overview of the 
correct placement of posts and 
anchors.

6

5

4

3

Summary of Contents for 111107

Page 1: ...Beach Set Beach Set Pro Beach Set Art Nr 111107 8 5 m...

Page 2: ...s zur Anpassung der Netzh he dient FUNTEC Sports GmbH L hestr 25 DE 53773 Hennef Tel 49 0 2242 3231 E Mail service funtec de www funtec de Setze nun die gelben Spanngurte zusammen Achte darauf dass si...

Page 3: ...tische Netzzentrierung Streife die kleine Schlaufe der schwarzen Bungees ber das obere Netzpfostenende Das schwarze Kunststoffr hrchen verbindest du dann mit der roten Leine oben am Netz Die schwarzen...

Page 4: ...ung am besten in die Rohre Dann k nnen sie in der Tasche nicht herausfallen Spanne alle vier Spanngurte gleichm ig ab und stelle die Netzpfosten dabei senkrecht Die schwarzen Haken werden in die Metal...

Page 5: ...LIFE starts now Let the game begin...

Page 6: ...e base FUNTEC Sports GmbH Loehestr 25 DE 53773 Hennef Germany Tel 49 2242 3231 service funtec de www funtec de Assemble the two parts of the yellow straps as shown Make sure the loops are positioned a...

Page 7: ...tic net centring Connect the black elastic cords to the top of the post and then to the red net cords at the top corners of the net as shown The tension of the bungees will keep the net centred betwee...

Page 8: ...nchor in a single pole section Tighten the yellow straps and adjust the position of the post as necessary to get the posts upright The net should now align midway between the poles automatically Adjus...

Page 9: ...Pfostenset h henverstellbar Aluminium poles with adjustable base 2 Fu st cke Plastic base parts 3 4 Erdn gel Sand anchors 5 Spanngurte jeweils 2 teilig Tension straps 2 piece 6 7 8 Pro Beach Netz 8 5...

Reviews: