
a.
insert brackets into position.
ZINTRA
BAFFLE (V2) BOLT
I
NSTALLATION INSTRUCTIONS
www.baresque.com
PAGE 2
INSTALL INSTRUCTIONS
2
3
c.
Tighten the knob
a.
Mallee screen is ready to be
mounted to the desk.
MALLEE
DESK SCREEN
(Clamp Bracket)
b.
Tighten the bolts and ensure
mount is straight
b.
Leave the gap of (16mm / 0.63”)
for cable management if required