![FUNAI DDVR-7530D Service Manual Download Page 11](http://html1.mh-extra.com/html/funai/ddvr-7530d/ddvr-7530d_service-manual_2345793011.webp)
1-4-4
DVD_NOTE
Instructions for Handling
Semi-conductors
Electrostatic breakdown of the semi-conductors may
occur due to a potential difference caused by electro-
static charge during unpacking or repair work.
1. Ground for Human Body
Be sure to wear a grounding band (1M
Ω
) that is prop-
erly grounded to remove any static electricity that may
be charged on the body.
2. Ground for Workbench
(1) Be sure to place a conductive sheet or copper plate
with proper grounding (1M
Ω
) on the workbench or
other surface, where the semi-conductors are to be
placed. Because the static electricity charge on
clothing will not escape through the body ground-
ing band, be careful to avoid contacting semi-con-
ductors with your clothing.
CBA
< Incorrect >
CBA
Grounding Band
Conductive Sheet or
Copper Plate
1M
Ω
1M
Ω
< Correct >
Summary of Contents for DDVR-7530D
Page 31: ...1 12 3 E8BA9SCM1 Main 1 7 Schematic Diagram VCR Section...
Page 32: ...1 12 4 E8BA9SCM2 Main 2 7 Sensor Schematic Diagram VCR Section...
Page 33: ...1 12 5 E8BA9SCM3 Main 3 7 Schematic Diagram VCR Section...
Page 34: ...1 12 6 E8BA9SCM4 Main 4 7 Schematic Diagram VCR Section...
Page 35: ...1 12 7 E8BA9SCM5 Main 5 7 Schematic Diagram VCR Section...
Page 36: ...1 12 8 E8BA9SCM6 Main 6 7 Schematic Diagram VCR Section...
Page 37: ...1 12 9 E8BA9SCM7 Main 7 7 DVD Open Close Schematic Diagram VCR Section...
Page 39: ...1 12 11 E8BA9SCJ Jack A Schematic Diagram VCR Section...
Page 41: ...1 12 13 E8BA9SCD2 DVD Main 2 3 Schematic Diagram DVD Section...
Page 43: ...1 12 15 E8BA9SCD3 DVD Main 3 3 Schematic Diagram DVD Section...
Page 68: ...DDVR 7530D E8BA9ED 2007 02 08...