Fulham FireHorse FHEC30 Series General Installation Manuallines Download Page 2

GENERAL INSTALLATION 

2011-604-2-rev

GUIDELINES FOR  

FHEC30 SERIES

BACK MOUNTING

1. Remove back cover.
2. Remove necessary knockouts and fasten back cover to J-box.
3. Connect 20” jumper leads to AC input leads in J-box. Use Black wire for 120 volt, Red wire for 277 volt,

White wire is common.

4. Only after continuous AC power can be provided, connect battery lead to open socket on circuit board.
5. Secure faceplate to housing. Remove proper chevron(s) as required to indicate appropriate path of egress.

Wiring Diagram:

WARNING: 

Unused wires must be capped using enclosed wire nuts.

Fulham Co., Inc extends limited warranty only to the original purchaser or to the first user for the period of 

5 years 

from the date of manufacture as indicated by the date code stamped on each product and when 

properly installed and under normal conditions of use, including proper care and charging of batteries. 

Reviews: