- 9 -
►
Appliance start up
• The installation and 1st start up of the appliance
must be done by a qualified installer. That person will
also give you instructions on starting and running the
appliance .
•
Ensure that the installation is fully filled with water
and has been correctly bled and that there is a
sufficient pressure of 1.5 to 2 bars on the manometer
(ref . 2,
) .
• Close the installation's main circuit breaker .
In winter, so that the compressor can be
preheated, close the installation's main circuit
breaker (outdoor unit's power supply) some
hours before pressing the on/off button.
►
Quick start-up
Once your installer has started your installation for the
first time:
• Engage the start/stop switch .
During the regulator initialisation phase, the
display shows all the symbols and then "Data,
update" and then "State heat pump" .
• Select the "AUTO" heating mode (
) .
) .
• Adjust the date and time if necessary (
)) .
fig. 3 - Start-up
1 . User interface
2 . Manometer (installation hydraulic pressure)
3 . Start/stop switch
1
2
3
fig. 4 - Selecting the heating mode AUTO
and Select the DHW mode
fig. 5 - Setting the time and the date
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Press
OK
Press
OK
Press
OK
Press heating mode key to
return to basic display
Select menu
hour and date
Select one of the
lines :
hour / minutes
or day / month
or years
Make all the
settings
Press
OK
to
confirm each
setting
Time and date
Operator section
Time and date
Hours / minutes
Time and date
Hours / minutes
Waterstage / OPERATING INSTRUCTIONS / 2010 - EN