Returning the Server to Operation
153
▼
Connect the Power Cords to the Server
●
Reconnect both power cords to the power supplies.
Note –
As soon as the power cords are connected, standby power is applied.
Depending on the configuration of the firmware, the system might boot. See the
SPARC Enterprise T5440 Server Administration Guide
for configuration and power-on
information.
▼
Power On the Server
●
To power on the server, do one of the following:
■
To initiate the power-on sequence from the service processor prompt, issue the
poweron
command.
■
You will see an
-> Alert
message on the system console. This message
indicates that the system is reset. You will also see a message indicating that the
VCORE has been margined up to the value specified in the
default.scr
file
that was previously configured.
■
Example:
■
To initiate the power-on sequence manually, use a pen or pencil to press the
Power button on the front panel. See
“Front Panel Diagram” on page 3
for
Power button location.
Note –
If you are powering on the server following an emergency shutdown
triggered by the top cover interlock switch, you must use the
poweron
command.
->
start /SYS
Summary of Contents for SPARC Enterprise T5440 Server
Page 1: ......
Page 2: ......
Page 6: ......
Page 26: ...xxiv SPARC Enterprise T5440 Server Service Manual July 2009 ...
Page 84: ...58 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Page 180: ...154 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Page 192: ...166 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Page 198: ...172 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Page 212: ...186 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Page 213: ......
Page 214: ......