Returning the Server to Operation
181
Related Information
■
“Reinstall the Server in the Rack” on page 178
■
“Connect Power Cords to the Server” on page 181
■
“Power On the Server Using the
■
“Power On the Server Using the Front Panel Power Button” on page 182
▼
Connect Power Cords to the Server
●
Reconnect both power cords to the power supplies.
Note –
As soon as the power cords are connected, standby power is applied.
Depending on how the firmware is configured, the system might boot at this time.
Related Information
■
“Power On the Server Using the
■
“Power On the Server Using the Front Panel Power Button” on page 182
▼
Power On the Server Using the
poweron
Command
Note –
If you are powering on the server following an emergency shutdown that
was triggered by the top cover interlock switch, you must use the
poweron
command.
Summary of Contents for SPARC Enterprise T5140
Page 1: ......
Page 2: ......
Page 6: ......
Page 82: ...56 SPARC Enterprise T5140 and T5240 Servers Service Manual July 2009 ...
Page 154: ...128 SPARC Enterprise T5140 and T5240 Servers Service Manual July 2009 ...
Page 234: ...208 SPARC Enterprise T5140 and T5240 Servers Service Manual July 2009 ...
Page 239: ......
Page 240: ......