Chapter 2
Preparing to Install the Server
2-7
FIGURE 2-2
Power Cables With a Dual-Power Feed Connection
2.2.2.3
Grounding
The SPARC Enterprise M3000 server is shipped with a grounded type (three-wire
type) power cable. Always connect the power cables to grounded power outlets.
Contact the facilities manager or a qualified electrician to determine what type of
power is supplied to your building.
2.2.3
Checking the Installation Location
When installing the server, consider not only the device size but also the sizes of the
required service areas (maintenance areas). For details, refer to the
SPARC Enterprise
M3000 Server Site Planning Guide
.
PSU#1 PSU#0
CB: Circuit breaker
CB
CB
AC power supply
Summary of Contents for SPARC Enterprise M3000
Page 1: ......
Page 2: ......
Page 6: ......
Page 9: ...Contents vii B 3 4 2 fmdump e Command B 10 ...
Page 10: ...viii SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 22: ...xx SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 48: ...3 14 SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 56: ...4 8 SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 64: ...A 8 SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 75: ......
Page 76: ......