Configuration with expander board
▶
For the cabling with expander board, see
16x 2.5-inch HDDs and HDD extension box" on page 309
.
.
Concluding steps
▶
Install the fan bridge, see
"Handling the fan bridge" on page 92
▶
"Installing the system air duct" on page 68
▶
Insert all HDD/SSD modules, see
"Installing a 2.5-inch HDD/SSD module"
.
Ensure that you reinstall the HDD/SSD module in the bay it was
located before the HDD backplane replacement.
▶
Insert all dummy modules, see
"Installing a 2.5-inch dummy module" on
.
▶
.
▶
"Connecting the power cord" on page 82
.
▶
"Switching on the server" on page 83
.
7.5.10
Replacing a 2.5-inch HDD SAS backplane
(configuration with up to 32 HDD/SSD modules)
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Tools:
Phillips PH2 / (+) No. 2 screw driver
Preliminary steps
▶
"Locating the defective server" on page 47
.
▶
"Shutting down the server" on page 49
Hard disk drive (HDD) / solid state disk (SSD)
246
Upgrade and Maintenance Manual
TX2550 M5
Summary of Contents for PRIMERGY TX2550 M5
Page 20: ...Content Upgrade and Maintenance Manual TX2550 M5 ...
Page 106: ...Basic hardware procedures 106 Upgrade and Maintenance Manual TX2550 M5 ...
Page 322: ...Fans 322 Upgrade and Maintenance Manual TX2550 M5 ...
Page 392: ...Expansion cards and backup units 392 Upgrade and Maintenance Manual TX2550 M5 ...
Page 408: ...Main memory 408 Upgrade and Maintenance Manual TX2550 M5 ...
Page 428: ...Processor CPU 428 Upgrade and Maintenance Manual TX2550 M5 ...
Page 522: ...System board and components 522 Upgrade and Maintenance Manual TX2550 M5 ...
Page 631: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...