
74
Upgrade and Maintenance Manual
RX2520
M4
Basic software procedures
iRMC recovery procedure
Ê
Prepare a USB stick including the bootable iRMC firmware update image.
Ê
Ensure that the server has been shut down and disconnected from the
mains, see section
"Shutting down the server" on page 48
Ê
Connect the USB stick containing the iRMC firmware to a USB port.
Ê
Connect the server to the mains while pushing the ID button on the front
panel. Ask a second person to help you if necessary.
Ê
Ensure that the Global Error indicator and the ID indicator are flashing to
indicate that the server is entering the iRMC recovery state.
Ê
Press the Power On/Off button. The system will start the POST process.
Ê
During POST, press
[F12]
and select the connected USB stick as boot
device. The system will detect the USB stick.
Ê
Choose the
Recovery_L
option from the update tool menu to start the iRMC
update process.
V
CAUTION!
Do not interrupt the iRMC upgrade process after it has started. If the
process is interrupted, the iRMC BIOS may be permanently
corrupted.
I
If the iRMC does not work after flashing, disconnect the system from
the mains and reconnect it again.
Ê
Shut down the server by pressing the power On/Off button.
Ê
Disconnect the server from the mains to exit the iRMC recovery state.
5.2.2
Verifying system information backup/restore
To avoid the loss of non-default settings when replacing the system board, a
backup copy of important system configuration data is automatically stored from
the system board NVRAM to the Chassis ID EPROM. After replacing the
system board the backup data is restored from the Chassis ID board to the new
system board.
In order to verify whether the backup or restore process has been successful,
check the System Event Log (SEL) using the ServerView Operations Manager
(see also section
"Viewing and clearing the System Event Log (SEL)" on
).
Summary of Contents for PRIMERGY RX2520 M4
Page 6: ...6 Upgrade and Maintenance Manual RX2520 M4 ...
Page 22: ...Upgrade and Maintenance Manual RX2520 M4 Content ...
Page 98: ...98 Upgrade and Maintenance Manual RX2520 M4 Basic software procedures ...
Page 118: ...118 Upgrade and Maintenance Manual RX2520 M4 Power supply unit PSU ...
Page 194: ...194 Upgrade and Maintenance Manual RX2520 M4 Fans ...
Page 232: ...232 Upgrade and Maintenance Manual RX2520 M4 Expansion cards and backup units ...
Page 310: ...310 Upgrade and Maintenance Manual RX2520 M4 Accessible drives ...
Page 338: ...338 Upgrade and Maintenance Manual RX2520 M4 Front panel ...
Page 410: ...410 Upgrade and Maintenance Manual RX2520 M4 Appendix A ...
Page 412: ...412 Upgrade and Maintenance Manual RX2520 M4 Appendix B ...
Page 451: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan January 2017 ...