
48
Operating Manual
CX420
S1
Starting up and operation
6.1.3.3
Indicator on hot-plug power supply unit
Figure 9: Indicator on hot-plug PSU
6.1.3.4
Indicators of the server nodes
I
The description of the indicators of the server nodes you may find in the
PRIMERGY CX272 S1 Server Node Operating Manual.
1
Indicator on hot-plug PSU (two colors)
1200 W PSU
:
Lights up green when the Dual Node Cluster Server is switched on and
functioning properly.
Lights up yellow if the PSU has failed.