"Installing the top covers" on page 56
.
▶
"Sliding the server enclosure into the rack" on page 68
▶
Install all HDD/SSD modules in the relevant HDD/SSD cages, see
"Installing a 2.5-inch HDD/SSD module" on page 114
▶
If applicable, install all 2.5-inch HDD/SSD dummy modules into the relevant
cage, see
"Installing a 2.5-inch dummy module" on page 117
.
▶
If applicable, install the front bezel, see
"Installing the front bezel" on
▶
"Installing server nodes in the server enclosure" on page 81
.
▶
"Installing the new hot-plug PSU" on page 101
.
▶
"Connecting the power cord" on page 84
▶
"Switching on the server nodes" on page 86
.
7.8
Replacing the HDD/SSD bridge board
Field Replaceable Unit
(FRU)
Hardware: 40 minutes
Tools:
Preliminary and concluding steps: Phillips PH2 / (+) No. 2
hexagonal cross SW5 / PZ2
Main steps: tool-less
Preliminary steps
▶
Shut down the server nodes, see
"Shutting down the server" on page 41
.
▶
"Disconnecting the power cord" on page 42
.
▶
"Removing the defective hot-plug PSU" on page 100
.
▶
"Removing server nodes from the server enclosure" on page 43
.
▶
If applicable, remove the front bezel, see
Hard disk drive (HDD) / solid state disk (SSD)
CX400 M6
Upgrade and Maintenance Manual
135