20
ETERNUS
LT20
S2
Identifying Product Components
Installing the Tape Library
3.3
Identifying Product Components
Confirm that you have received the following:
●
Library
●
P
ower cord
●
Manual CD-ROM
●
Rack mount kit:
–
2 rack mount rails
–
1
bag of eight round hole rack screws
–
1
bag of eight Square hole rack screws
●
Cover eject bar
●
1 cleaning cartridge
3.4
Remove the Shipping Lock
I
The shipping lock, which prevents the robot transport mechanism from
moving during shipment, must be removed before the library is powered
on.
A yellow label with instructions regarding the shipping lock covers the power
button, as shown in the following picture:
Figure 7: Instructions for shipping lock
Summary of Contents for ETERNUS LT20 S2
Page 10: ......
Page 34: ......
Page 80: ......
Page 104: ......
Page 108: ......
Page 110: ......
Page 112: ......
Page 115: ...ETERNUS LT20 S2 115 Blank ...
Page 116: ...116 ETERNUS LT20 S2 Related Publications an Links Blank ...