Fuji Electric ZFK8 Series Instruction Manual Download Page 28

Output signal hold:

 

   

Output signal is held during calibration, 
processing recoverable sensor, process-
ing diagnosis of sensor, warm-up, PID 
auto tuning, under set up maintenance 
mode "available" and blowdown. The 
hold function can also be released.

Valve and Flow meter (option): 

Selects zero or span gas during manual 
zero or span calibration. Mounted on the 
side of the converter.

Communication function: 

   

RS485 (MODBUS) (option)

Combustion efficiency display (option): 

 

 

When you select this display, "rich mode 
display" will be simultaneously displayed. 
This function calculates and displays 
combustion efficiency from oxygen 
concentration and measured gas tem-
perature.

 

Thermocouple (R) is required for tem-
perature measurement.

Operating temperature: 

20 to +55ºC

Operating humidity:

 

95% RH or less, non condensing

Storage temperature: 

30 to +70ºC

Storage humidity: 

95% RH or less, non condensing

Construction:

  

Dust-proof, rainproof construction 

   

(corresponding to IP66 or IP67 of IEC)

Material: 

 Aluminum 

case

Outer dimensions (H x W x D): 

170 X 159 X 70mm (IP66, Bench type) 
220 X 230 X 95mm (IP67) 
182 X 163.5 X 70.6mm (Bench type)

Mass {weight}: 

 

IP66: Approx. 2kg (excluding cable and 

detector)

   

IP67: Approx. 4.5kg (excluding cable and 

detector)

Finish color: 

 IP66: 

Case: 

Silver

 

Cover: Pantone Cool Gray 1C-F

   

IP67: Munsell 6PB 3.5/10.5 (blue) 
 

Cover: Silver (case)

Mounting method:

 Mounted flush on panel or on pipe

  Converter specification (ZKM)

Concentration value indication: 

   

Digital indication in 4 digits

Contact output signal:

(1) Contact specification; 6 points, 1a 250V AC/3A or 30V DC/3A
(2) Contact function;

s 5NDERMAINTENANCE

s 5NDERBLOWDOWN.OTE 

s 3PANCALIBRATIONGASVALVE

s :EROCALIBRATIONGASVALVE

s )NSTRUMENTANOMALIES.OTE 

s !LARM.OTE 

  Note1)  The following Instrument errors (1) Thermocou-

ples break (2) Sensor break (3) Temperature fault 
(4) Calibration fault (5) Zero/span adjustment fault 
(6) Output error turn the contact-ON

  Note2)  Alarm selects just one as mentioned below (1) 

High (2) Low (3) Upper and Lower (4) High-high 
(5) Low-low, it turns ON while operating.

  Note3)  Under blow down is available in case of option, 

and it turns ON while operating. 

Contact input signal:

  (1) Contact specification; 3points (the following option)
   

ON; 0V (10mA or less), OFF; 5V

  (2) Contact function;

s %XTERNALHOLD

s #ALCULATIONRESET

s (EATER/&&

s "LOWDOWNOPTION 

s )NHIBITIONOFCALIBRATION

s #ALIBRATIONSTART

s 2ANGECHANGE

Calibration method:

  

(a) 

Manual calibration with key operation

   

(b) Auto. calibration (option)

   

 

Calibration cycle; 00 day 00 hour to  

 

99 days 23 hours 

  

(c) 

All 

calibration

 

Calibration gas:

 s !VAILABLERANGESETTINGS

   

  Zero gas; 0.010 to 25.00% O

2

   

  Span gas: 0.010 to 50.00% O

2

s 2ECOMMENDEDCALIBRATIONGASCONCEN

tration 

   

Zero gas; 0.25 to 2.0% O

2

   

Span gas; 20.6 to 21.0% O

2

 

 

 

(oxygen concentration in the air)

Blowdown:

 

A function for blowing out with com-
pressed air dust that has deposited in 
the flow guide tube.  Blowdown can be 
performed for a predetermined time and 
at predetermined intervals.

   

Blowdown cycle;  00 hour 00 minute to 

99 hours 59 minutes

   

Blowdown time;   0 minute 00 second 

to 0 minutes 999 
seconds

(option)

All manuals and user guides at all-guides.com

Summary of Contents for ZFK8 Series

Page 1: ...Instruction Manual THE DIRECT INSERTION TYPE ZIRCONIA OXYGEN ANALYZER DETECTOR TYPE ZFK8 INZ TN5ZFK8d E All manuals and user guides at all guides com a l l g u i d e s c o m...

Page 2: ...J WKLV PDQXDO LW VKRXOG DOZD V EH NHSW LQ D SODFH ZKLFK DOORZV WKH SHUVRQ ZKR RSHUDWHV LW WR refer to any time as requirfed GXH FRQVLGHUDWLRQ VKRXOG EH JLYHQ VR WKDW WKLV LQVWUXFWLRQ PDQXDO LV GHOLYHU...

Page 3: ...LRQV VHW IRUWK LQ LQ VWUXFWLRQ PDQXDO 7KH XVH DW D SODFH QRW FRQIRUPLQJ WR WKH LQVWDOODWLRQ FRQGL WLRQV PD UHVXOW LQ DQ HOHFWULF VKRFN D UH DQG PDOIXQFWLRQ KHQ WKLV SURGXFW LV PRXQWHG RQ D IXUQDFH ZKL...

Page 4: ...WLQJ D EXUQ HIRUH FOHDQLQKJ WKH RZ JXLGH WXEH WXUQ RII WKH PDLQ SRZHU DQG FRRO WKH WXEH GRZQ IXOO There is a fear of getting a burn RQ W XVH DQ RWKHU UHQHZDO SDUW WKDQ WKRVH GHVLJQDWHG E WKH PDNHU 2WK...

Page 5: ...G 3LSLQJ 3LSLQJ RI FDOLEUDWLRQ JDV 3LSLQJ RI UHIHUHQFH JDV LQOHW 3LSLQJ IRU EORZ GRZQ DLU 3LSLQJ GUDZLQJ 8 LULQJ HIRUH ZLULQJ LULQJ WR HDFK WHUPLQDO 0RXQWLQJ RI FRQGXLW 2SHUDWLRQ DQG 6WRS 6WDUW RI RSH...

Page 6: ...URO VLJQDO SURFHVVLQJ RXWSXW GLVSOD DQG H WHUQDO WUDQVPLVVLRQ 7KH GHWHFWRU DQG FRQYHUWHU DUH FRQQHFWHG ZLWK D FDEOH 1 INTRODUCTION High oxygen partial pressure side PH Low oxygen partial pressure side...

Page 7: ...6HH WHP Thermo sticker FFHVVRULHV VK 6HH WHP 6 HUDPLF OWHU FFHVVRULHV VK 6HH WHP ORZ JXLGH WXEH 6SHFL FDWLRQ JRRGV V RUGHUHG 6HH WHP DQG 8 HDW LQVXODWLQJ FRYHU 6SHFL FDWLRQ JRRGV V RUGHUHG 6HH WHP 5H...

Page 8: ...K DOORZV GRLQJ GDLO FKHFN DQG ZLULQJ ZRUN 3ODFH ZKHUH WKHUH LV OLWWOH YLEUDWLRQ GXVW DQG KXPLGLW 3ODFH ZKHUH SHULSKHUDO DLU HQYLURQPHQW LV QRQ FRUURVLYH 3ODFH ZKHUH WKHUH DUH QR HOHFWULF DSSOLDQFHV SU...

Page 9: ...H WR RU OHVV UHJDUGOHVV RI WKH PHDVXUHG JDV WHPSHUDWXUH How to check RPSOHWH WKH PRXQWLQJ SLSLQJ DQG ZLULQJ RI WKH GHWHFWRU PDNH VXUH WKH FRORU RI WKHUPR VWLFNHU SXW RQ WKH GHWHFWRU DQJH LV QRW FKDQJL...

Page 10: ...KH SDUWLWLRQ SODWH LQVLGH WKH RZ JXLGH WXEH WR WKH JDV RZ DQG PRXQW WKH WXEH VR WKDW WKH WRQJXH WXUQV WR D GRZQ VWHDP GLUHFWLRQ UHODWLYH WR JDV RZ Mating flange not included in scope of supply Gas flo...

Page 11: ...4 Mounting of heat insulating cover RU XVLQJ DW D FROG GLVWULF XVH D KHDW LQVXODWLQJ FRYHU RU WKH SDUW 1R IRU DGGLWLRQDO SURFXUHPHQW RI WKH KHDW LQVXODWLQJ FRYHU UHIHU WR WHP 3XW 0 PRXQWLQJ VFUHZ RI W...

Page 12: ...6HW RQH RI WKH WZR UHIHUHQFH JDV SRUWV DV LQOHW DQG WKH RWKHU DV RXWOHW QVWDOO SLSLQJ VR WKDW GXVW RU ZDWHU GRHV QRW HQWHU WKH RXWOHW 3LSLQJ IRU EORZ GRZQ DLU RQQHFW WKH EORZ DLU LQOHW ORFDWLRQV RI EO...

Page 13: ...act input Alarm contact output Maintenance contact output Calibrating gas contact output Note 1 Standard gas or instrumentation air can be used in place of span gas 2 Instrument quality air or bottled...

Page 14: ...ermocouple for combustion control Contact input Alarm contact output Maintenance contact output Calibrating gas contact output Note 1 Standard gas or instrumentation air can be used in place of span g...

Page 15: ...ut Heater HEATER Thermocouple for combustion control Contact input Alarm contact output Maintenance contact output Calibrating gas contact output Option 2 Ref air to Detector Flowmeter Flowmeter Valve...

Page 16: ...noid valve not supplied Reduction valve ZBD6 Reduction valve ZBD6 Span gas Standard gas for zero point ZBM Joint Ejector system AC power supply O2 input Thermocouple input Analog output 4 to 20mA DC o...

Page 17: ...URFHHGLQJ ZLWK WKH ZLULQJ ZRUN EH VXUH WR WXUQ RII WKH PDLQ SRZHU VXSSO 2WKHUZLVH WKHUH is a fear of getting an electric shock V WKH ZLULQJ PDWHULDO XVH D SURSHU RQH FRQIRUPLQJ WR WKH UDWLQJ RI DSSDUD...

Page 18: ...U PRUH LQ UDWLQJ RU 5 WKHUPRFRXSOH 6SHFL HG LQ 6 HTXLYDOHQW WR 5 PP 6 5HFRPPHQGHG ZLUH URG DW Composition For heater Element output compensation conductor 1RPLQDO VHFWLRQDO DUHD PP 1XPEHU RI FRPSRVHG...

Page 19: ...RI WKH PDLQ ERG LW WKH SDFNLQJ KROGHU QXW DQG SDFNLQJ RQWR WKH FRQGXLW DQG W WKH HQG IDFH RI FRQGXLW LQWR D JURRYH RI WKH EXVKLQJ QVHUW WKH EXVKLQJ WWHG WR WKH FRQGXLW LQWR 0 FRXSOLQJ RI WKH PDLQ ERG...

Page 20: ...IHUHQFH JDV VXSSO LW EHIRUH WKH FDOLEUDWLRQ RZ UDWH WR PLQ 5 2 Stop of operation I WKH SRZHU LV WXUQHG RQ LQ LQ D VWDWH RI GHZ FRQGHQVDWLRQ LW OHDGV WR WKH IDLOXUH RI GHWHFWRU 6WRS WKH RSHUD WLRQ IROO...

Page 21: ...RI WKH FRQYHUWHUV 0 50 DQG 5 FKHFN RQFH D ZHHN DV D URXJK VWDQGDUG FDOLEUDWLRQ JDV RZ UDWH WR PLQ KHQ WKH FRQYHUWHUV 0 50 DQG 5 DUH QRW XVHG 5XQQLQJ WKH HUR DQG VSDQ FDOLEUDWLRQ JDVHV PDNH FDOLEUDWLR...

Page 22: ...XQLW DQG R ULQJ IURP WKH GHWHFWRU WWDFK WKH VXSSOLHG 2 ULQJ RI WKH UHSODFHPHQW VHQVRU XQLW WR WKH JURRYH IRU WKH 2 ULQJ DW WKH GHWHFWRU WWDFK WKH UHSODFHPHQW VHQVRU XQLW WR WKH GHWHFWRU WWDFK WKH VHQV...

Page 23: ...QJ ZLWK WKH XVH RI D VFUXEELQJ brush 5HPRYH GXVW VWLFNLQJ WR WKH LQVLGH RI WKH RZ JXLGH WXEH E XVLQJ D PHWDOOLF URG RU VFUHZGULYHU OHDQ VR WKDW WXEH LV WKURXJK DW OHDVW DERXW SDUW RI WKH ZKROH LQWHULR...

Page 24: ...WRU UHIHU WR WKH VWDQGDUG RXWSXW WDEOH EHORZ 6WDQGDUG RXWSXW WDEOH 5HIHUHQFH 2 JHQ concentration 9RO Detector output 8QLW P9 2 JHQ concentration 9RO Detector output 8QLW P9 2 JHQ concentration 9RO Det...

Page 25: ...SLHFHV DUH UHTXLUHG IRU WKH VWDQGDUG JDV LQOHW RXWOHW 5HIHUHQFH JDV LQOHW IRU LQFK WXEH GGLWLRQDOO procurement part 3 7 3 DVNHW LQFOXGHG SLHFHV DUH UHTXLUHG IRU WKH VWDQGDUG JDV LQOHW RXWOHW 5H HFWRU...

Page 26: ...HSODFH FDEOH UURU LQ ZLULQJ KHFN ZLULQJ LUH FRUUHFWO RZ VXSSO YROWDJH KHFN LI VXSSO SRZHU LV DV VSHFL HG 6XSSO FRUUHFW SRZHU LVFRQQHFWLRQ RI WKHUPR couple KHFN FRQWLQXLW KHFN LI UHVLVWDQFH DFURVV WHUP...

Page 27: ...erature 10 to 60 C for Primary detecting ele ment 5 to 100 C for ejector section 125 C or less at detector ange surface with power applied When sample gas temperature is lower than 150 C and the outsi...

Page 28: ...on in 4 digits Contact output signal 1 Contact speci cation 6 points 1a 250V AC 3A or 30V DC 3A 2 Contact function s 5NDER MAINTENANCE s 5NDER BLOWDOWN OTE s 3PAN CALIBRATION GAS VALVE s ERO CALIBRATI...

Page 29: ...particulate with 1000mm cover Others Protection cover Without With Power supply 100 to 120VAC 50 60Hz 200 to 240VAC 50 60Hz Cal gas inlet For 6mm tube SUS For 1 4 inch tube SUS Ball valve 0 Y 0 5 A 3...

Page 30: ...e detector side Both sides Types For R thermocouple K R YA YB YC YD YE YF YG YH YJ YK YL YM AA BB CC DD 0 1 2 Note5 For connection between detector and converter the conduit to be used should be rainp...

Page 31: ...e Or 1 4 inch tube Ground wire Screw M4 80 67 6 0 Approx 62 Approx 132 Approx 130 5 79 26 Approx 30 125 5 85 5HSODFHPHQW VHQVRU XQLW 3 1 6 T H S 4 2 5 T H S made in japan TK4J4664R0 4 3 5 For detector...

Page 32: ...e 11th Z F K 8 R 5 5 B 3 5 7 1 67 6 M5 detector side ORZ JXLGH WXEH ZLWK EORZ GRZQ QR OH 5 7 1 18 Approx L Approx 20 67 60 5 Gas inlet 8 15 MTG holes 6 M5 detector mounting side 67 130 155 Z F K 8 R 5...

Page 33: ...or prevention of drain 67 29 5 1 4 5 1 8 0 4 Rc1 4 with plug Flange JIS 5K80A FF ZFK MTG position 50 30 185 Approx L Gas flow Gas outlet Packing Tube 50A SCH40 3 5 7 1 Z F K 8 R 5 6 D 3 L m 5 7 1 4 5...

Page 34: ...ge is approx 150mm Do not block the gas outlet 175 Approx L 10 Approx L Gas flow Gas outlet Packing 38 Protection tube 65A SCH40 Tube 50A SCH40 3 5 7 1 Z F K 8 R 5 6 E 3 L m 5 7 1 7 1 9 0 11 4 13 6 L...

Page 35: ...ors Planning Dept 1 Fuji machi Hino city Tokyo 191 8502 Japan http www fujielectric com Phone 81 42 514 8930 Fax 81 42 583 8275 http www fujielectric com products instruments All manuals and user guid...

Reviews: