![Fuji Electric PUMCL Instruction Manual Download Page 3](http://html1.mh-extra.com/html/fuji-electric/pumcl/pumcl_instruction-manual_2341961003.webp)
- 3 -
- 4 -
Mounting
-
Dimensions
1.5
6
30
85
(10)
(8)
(30)
100
5
50
6.1
LOADER
PUM-C
PWR
BUS
L.RUN
L.ERR
SD
RD
STATION No.
7
6
5
4 3 2 1
0
9
8
x10
7
6
5
4 3 2 1
0
9
8
x1
Front screw terminal cover
(optional)
Main unit (when detached from the base part)
Terminal block
(when detached
from the
main unit)
Base part
(when detached from
the main unit)
(mm)
Terminal
screw
size M3
Terminal
screw size M3
When locking tab is released
(when mounting / dismounting to / from DIN rails)
DIN rail
Cautions when mounting
In order to aid heat dissipation, 30mm of clearance (50mm recommended) above and
under the controllers should be provided.
30 or more
30 or more
-
Mounting to DIN rails
1. Pull down the locking tab of the
base part. Hook the back of the
controller onto the upper part of
DiN rail.
2.
Push the controller in the
direction of arrow 2.
3. Push up the locking tab to fasten
the controller to DIN rail.
-
When connecting controllers after
attaching to DIN rail, push up
the locking tab after connecting
controllers.
-
Attaching end plates
When attaching controllers to DIN rails, we recommend to attach side connecting
terminal covers (right and left 1set), then end plates (option) to the ends of the right
most and left most controllers.
-
Fixing with screws
When mounting controllers inside a cabinet with screws, connect the base parts of
controllers first.
-
Fixing screws are not included. Please prepare screws as required.
1. Refer to the figure below for the mounting
screw hole size to decide the mounting position.
2.
Remove the main units from the base part.
See [How to detach the base part]
3. Connect base parts. Push up to fasten all the locking tabs.
4. Fixate the base parts onto the mounting position inside the cabinet with screws.
5. Attach the main units to the base parts.
-
Connecting controllers
1. Check that locking tabs are pulled down
(released).
2. Connect controllers with each other using
side connectors.
3. After mounting connected controllers onto
DIN rail, make sure to push up all locking
tabs. Controllers are fastened to DIN rail and
to each other.
4.
All connected controllers are connected to
power supply via side connectors if one of
controllers is directly connected to them.
Wiring
-
Front terminal block
Vacant
Vacant
LOADER
PUM-C
PWR
BUS
L.RUN
L.ERR
SD
RD
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
STATION No.
7
6
5
4
3
2
1
0
9
8
x10
7
6
5
4
3
2
1
0
9
8
x1
DA
DB
DG
SLD
FG
CC-Link
22
21
23
25
24
Internal Communication
Terminating Resistance
(option)*
* This terminating resistance is different from the CC-Link terminating resistance
(this is the terminating resistance for inter-module communication).
Install the resistance (100
Ω
) supplied with this controller.
12
11
-
Base part (power terminal)
DC 24V (‑)
Power Terminal
DC 24V (+)
Note: The power cables more than one should not be connected.
Specification
General Specification
Power Supply
: DC24V±10%
Power Consumption
: Maximum 3.2W (135mA) [when DC24V is applied]
Dimensions
: 30 (W) × 100 (H) × 85 (D) mm (excluding the terminal cover and a
projection)
Weight
: Approx. 200 g
Installation method
: Mounting on the wall or, install in the cabinet with the DIN rail with
M3 screws
Ambient temperature *
: -10 to 50 degrees C
* "Ambient temperature" is the temperature underneath the controller
inside equipment or the cabinet where the controller is installed.
Ambient humidity
: 90% RH or less (non condensing)
System maximum modules : Up to max. 17 modules of any Model PUMA/B/C/CL/CM/V/N/T plus
to max 16 modules of Model PUME
System power
: 24V dc, 100W maximum, Class 2
Memory backup
: Nonvolatile memory (EEPROM) backup
No.of updates : 100,000
Communication function
Compliant version
: CC-Link Ver.2.00 / 1.10
Station type
: Remote device station
Communication speed and distance
Communication
speed
156kbps
625kbps
2.5Mbps
5Mbps
10Mbps
Communication
distance
1200m or less
900m or less
400m or less
200m or less
100m or less
* For more details, refer to “CC-Link Cable Wiring Manual” issued by CC-Link Partner Association.
No. of stations occupied / Station No.: 4 stations / Settable Station No. 1 to 61
Communication data length
No.of stations occupied /
Extended cyclic
Remote input/output
(RX/RY)
Remote register
(RWr/RWw)
Control module
(PUM-A) No. of
connectable units
4 stations occupied x 1 128 bit each
16 words each
2 or 4 units
4 stations occupied x 2 256 bit each
32 words each
4 or 8 units
4 stations occupied x 4 512 bit each
64 words each
8 or 16 units
Connecting cable
: Ver.1.10 compliant CC-Link special cable
Connecting method
: M3 screw terminal block
Terminating resistance
: External (110 ohm, 1/2W)
Crimp terminal size
Please prepare cables and crimp terminals of the size indicated below.
When using a AWG-16 cable, you should use the crimp terminal that material thickness is 0.9mm
or less.
Cable type
Size
Thermocouple (Compensation lead wire)
0.25 to 1.25mm
2
(AWG 22 to 16)
Power supply, output, others
0.25 to 1.25mm
2
(AWG 22 to 16)
Crimp terminal
Cable size
Screw tightening torque
0.25 to 1.25mm
2
(AWG 22 to 16)
0.8 N•m
φ
3.2mm
6.
0m
m
o
r l
es
s
Ring crimp terminal
Y crimp terminal
3.2mm
6.
0m
m
o
r l
es
s
* Material thickness
0.9mm or less.
Model code
Enhanced communication module (CC-Link)
1 2 3 4 5 6 7 8
9 10
P U
1
-
0
M
Y Y
C
L
A
B
Contents
Module type
Advanced communication module
Communication function
CC-Link communication
Instruction manual
Japanese
English
Accessories (Optional)
1 2 3 4 5 6 7 8
P U M Z *
A 0 2
A 0 3
A 0 4
L 0 1
Contents
DIN rail mounting end plate
Side connecting terminal cover (right & left 1 set)
Front face screw terminal cover
Loader connecting cable (RS-232C)
LOADER
PUM-C
LOADER
PUM-A
PWR
COM
OUT1
OUT2
OUT3
OUT4
STATION
4
3
2
1
0
F
E
D
C
B
A
9
8
7
6
5
Locking tab
Side connector
PWR
BUS
L.RUN
L.ERR
SD
RD
STATION No.
7
6
5
4
3
2
1
0
9
8
x10
7
6
5
4
3
2
1
0
9
8
x1
LOADER
PUM-C
PWR
BUS
L.RUN
L.ERR
SD
RD
LOADER
PUM-A
PWR
COM
OUT1
OUT2
OUT3
OUT4
STATION
4
3
2
1
0
F E D C B A
9
8
76
5
LOADER
PUM-A
PWR
COM
OUT1
OUT2
OUT3
OUT4
STATION
4
3
2
1
0
F E D C B A
9
8
76
5
STATION No.
7
6
5
4 3 2 1
0
9
8
x10
7
6
5
4 3 2 1
0
9
8
x1
(30)
9
0.2
88.5
0.
2
(100)
(3)
30
+0.7
+0.2
2-M3
[mm]
How to detach the base part
1.
Press the lock lever on the top of the
controller.
2. Pull down the upper part of main unit.
3.
Detach the cutout on the lower end
of back of the main unit from the
projection on the base part.
-
When attaching the main unit to the
base part, take the reverse procedure
to removing the main unit from the
base part.
-
Make sure that the lock lever of the
main unit is fitted into the base part.
Lock lever
Main
Projection
Locking tab
DIN rail
Hook the back
of controller
LOADER
PUM-C
LOADER
PUM-E
PWR
COM
STATION
4
3
2
1
0
F E D C B A
9
8
76
5
Di1
Di2
Di3
Di4
Di5
Di6
Di7
Di8
Do1
Do2
Do3
Do4
Do5
Do6
Do7
Do8
LOADER
PUM-E
PWR
COM
STATION
4
3
2
1
0
F E D C B A
9
8
76
5
Di1
Di2
Di3
Di4
Di5
Di6
Di7
Di8
Do1
Do2
Do3
Do4
Do5
Do6
Do7
Do8
LOADER
PUM-E
PWR
COM
STATION
4
3
2
1
0
F E D C B A
9
8
76
5
Di1
Di2
Di3
Di4
Di5
Di6
Di7
Di8
Do1
Do2
Do3
Do4
Do5
Do6
Do7
Do8
LOADER
PUM-A
PWR
COM
OUT1
OUT2
OUT3
OUT4
STATION
4
3
2
1
0
F E D C B A
9
8
76
5
PWR
BUS
L.RUN
L.ERR
SD
RD
STATION No.
7
6
5
4 3 2 1
0
9
8
x10
7
6
5
4 3 2 1
0
9
8
x1
Side connecting terminal cover
(right & left 1 set)
DIN rail mounting
end plate
DIN rail mounting
end plate
Gate City Ohsaki, East Tower, 11-2, Osaki 1-chome,
Shinagawa-ku, Tokyo 141-0032, Japan
http://www.fujielectric.com
Phone: 81-3-5435-7280, 7281 Fax: 81-3-5435-7425
http://www.fujielectric.com/products/instruments/
International Sales Div
Sales Group