6. When the user is ready to operate the sensor - enable the power. When using a benchtop PSU ensure
the required voltage is supplied (6-30VDC) and the current output is enabled
7. Once the above sequence is complete, wait approximately 5 seconds and then run Acu-Vis by selecting
the shortcut icon on the desktop
Figure 4: Acu-Vis 2.0 Windows Launch Icon
8. If you need to change the Acu-Test cable it is recommended to
press the ‘Disconnect’ button and follow the
exit process, close the Acu-Vis program and then disable the power. Remove the USB cable and replace
with the required cable
In case of technical issues please contact the technical support team at FT Technologies.