background image

FSR

244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207

43174

LIT1394

 

ASSEMBLED VIEW

UNDERSIDE VIEW OF SHROUD

T6 SUB-ASS'Y

INSTALL DESIRED BRACKETS INTO THE
'T6' SUB-ASS'Y.  DROP THE SUB-ASS'Y
INTO THE HOLE IN THE TABLE
(COVER ORIENTATION IS PRE-SET
BY THE SHROUD INSTALLATION).

INSTALL CLAMP SHROUD TO UNDERSIDE
OF TABLE HOLE WITH (5) WOOD SCREWS
AS SHOWN.  ORIENT PER DESIRED
COVER SWING DIRECTION.

PASS THE DESIRED-LENGTH (2) LONG
SCREWS THRU THE SHROUD AND THREAD
INTO THE SUB-ASS'Y.  TURN THE 3/8"-LONG
CLAMP NUTS UP SNUG AGAINST THE
SHROUD BASEPLATE TO PULL THE
SUB-ASS'Y DOWN COMPLETELY INTO
PLACE IN THE PRE-CUT 6.00" DIA. HOLE.

MAKE ELECTRICAL CONNECTIONS AS
REQUIRED AND TIE-WRAP CABLES TO
TIE-TABS.  IF USING CABLE PULL BRACKET
(T6-LB-CP), ENSURE CONNECTORS IN THE
SUB-ASS'Y CAN BE PULLED OUT 3'-0" 
PRIOR TO SECURING CABLES TO TIE TABS.

T6 INSTALLATION

INSTRUCTIONS

2.75

5.50

7.00

3.37

9.00

6.75

3.38

2.75

5.50

(5) #6 / #8
     MOUNTING
     SCREW
     HOLES

6.00" DIA. THRU
HOLE IN TABLE

2

1

3

4

PRE-CUT 6.00" DIA.

HOLE IN TABLE

3/4" MIN. - 2-1/4" MAX.

TABLE THICKNESS

(7) CABLE

TIE TAB

(5) #6 / #8 x 1/2"

WOOD SCREW

(2) #6-32 x 2.00" or 2-1/2" or 3" LONG

PAN HEAD SCREW

(2) 3/8"-LONG

CLAMP NUTS

BRACKETS (SOLD

SEPARATELY) SHOWN

AS REFERENCE

Reviews: