580
45
0
620
500 Ctrs
Ground
level
Foundation 2 no.
pads
700x400x200mm in
C20 concrete
(recommendation
only)
420 Ctrs
Foundation 2 no.
pads
700x400x200mm in
C20 concrete
(recommendation
only)
2500
45
0
620
2420 Ctrs
Ground
level
420 Ctrs
17
5
200mm x M10
threaded rod
anchor resin fixed
into 12mm hole
M10 S/S
cap nut
50
700 x 400 x 200mm
C20 Concrete Base
(recommended)
Ground level
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS
COMPLETE UNIT.
Bench & Seat
(Surface Fix)
Stool
(Surface Fix)
Skop Bench / Seat / Stool
(surface fix only)
1. Install suitable foundation pads (see illustration) each with top face at ground
level
2. Position bench in correct orientation with bases centrally on foundation pads,
then mark hole positions through base plates.
3. Remove the bench; drill holes Ø12mm x 175mm deep
4. Clear debris from holes.
5. Fill the holes to within approximately 35mm from the top with Hilti HY150 resin (or
similar). Lift the seat (with threaded anchor rods/capnuts in place) and carefully
lower the anchors into the holes, leave for two hours before using.
6. Using a torque wrench, tighten nuts and washers over flange plates to 30Nm to fasten down the bench.
7. Check level
IMPORTANT NOTE:
Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on
stainless steel components.
5
SKOP installation