Make sure that the relative humidity of installation site is maintained at 10%~90%.
Site Environment:
Make sure that the temperature of installation site is maintained at 0°~50°.
The installation site must be well ventilated. Ensure that there is adequate air flow around the
switch.
Make sure that the switch is level and stable to avoid any hazardous conditions.
Make sure that the rack and working platforms are well earthed.
The installation site must be free from leaking, dripping water or heavy dew.
Keep the installation site dust-free.
Desk Mounting
Mounting the Switch
1. Attach four rubber pads to the bottom of switch.
2. Place the switch on a desk.
Left LED: Link/Act Mode Right LED: PoE Mode
SYS
PWR
PoE
CONSOLE
S3200-8M4GS-U
PoE+
1
2
3
4
5
6
7
8
9
10
11
12
10G
EN
5
Left LED: Link/Act Mode Right LED: PoE Mode
SYS
PWR
POE
CONSOLE
S3200-8M4GS-U
PoE+
1
2
COMBO
6
5
8
7
2
1
4
3
On=Link Flashing=ACT Green=
1000M Yellow=10
/100M