Installation Requirements
Before you begin the installation, make sure that you have the following:
The installation site must be well ventilated. Ensure that there is adequate airflow around the
switch.
Site Environment:
Do not operate it in an area that exceeds an ambient temperature of 50°C.
Phillips screwdriver.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ-45 Ethernet cables, fiber optical cables , and console cable for
connecting network devices.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
8