background image

Installation Diagram

Solution 1

Data Center & Cloud Computing Infrastructure Solution

POE POWER SUPPLY

AP

Internet

Summary of Contents for AP-S300

Page 1: ...Wireless Access Point 300Mbps WIRELESS AP ROUTER QUICK INSTALLATION GUIDE...

Page 2: ...nstallation Requirements CAT5 6 cable Phillips screwdriver Drill and drill bit 6 mm for wall mounting or 3 mm for ceiling mounting Optional Drywall or keyhole saw to cut 18 mm hole for Ethernet cable...

Page 3: ...Installation Diagram Solution 1 Data Center Cloud Computing Infrastructure Solution POE POWER SUPPLY AP Internet...

Page 4: ...into the web setting page independently Solution 2 Multiple Devices Setting Do centralized management settings and local portal by AC core gateway POE power supply and other devices are not standard...

Page 5: ...the device to the computer POE Power Supply Not Standard Higher Level Network LAN RESET WAN LED Color States White Power on Red WAN port connected Blue Wi signal received Hardware Overview LED Data Ce...

Page 6: ...screws let the AP and chassis docking installation over the chassis is removed whichis xed on the wall with four screws Note This quick installation guide is taken the circled ceiling AP for an exampl...

Page 7: ...68dBm 10 PER 130M 68dBm 10 PER 54M 85dBm 10 PER 11M 85dBm 10 PER 108M 68dBm 10 PER 1M 90dBm 10 PER 6M 88dBm 10 PER Data and operational parameters 802 11n 6 5 300Mbps 802 11g 6 9 12 18 24 36 48 54 10...

Page 8: ...uipment requires the use of the ground wire as a part of the safety certi cation modi cation or misuse can provide a shock hazard that can result in serious injury or death c Contact a quali ed electr...

Page 9: ...Returns No Products will be accepted for replacement or repair without obtaining a Return Materials Authorization RMA number from the company during the warranty period and the Products being receive...

Page 10: ...not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment o and on the user is encourag...

Page 11: ...ective 2002 96 EC requires that the equipment bearing this symbol on the product and or its packaging must not be disposed of with unsorted municipal waste The symbol indicates that this product shoul...

Page 12: ...OVA Neufahrn Gewer bepark Am G ld7 85375 Neufahrn bei Freising Munich Tel 49 0 89 414176412 Hong Kong Germany Addresses phone number and fax number also have been listed at www fs com Please e mail us...

Reviews: