10
Operation
5WPMAN0266 (Rev. 5/23/2008)
BACKFILLING
1.
Raise or remove scarifier shanks.
2.
Lower the blade to the ground and back up into the
fill material.
3.
Shorten the top link to raise the cutting blade and
control how much the blade digs in.
LEVELING
1.
Raise or remove scarifier shanks.
2.
Shorten the top link so the cutting edge clears the
ground.
3.
Drive forward with the box blade in this position
and loose material will be leveled.
STORAGE
■
Block equipment securely for storage (see
Blocking Up Box Blade, page 11).
Keep children and bystanders away from stor-
age area.
WARNING