![Frontgate 64445 Assembly & Operation Download Page 9](http://html1.mh-extra.com/html/frontgate/64445/64445_assembly-and-operation_2339661009.webp)
3
8
(Fig. 21)
(Fig. 22)
(Fig. 23)
To OPERATE the 360° Rotating Hub Swivel:
Place your foot on the foot pedal of the rotating hub and
step-on
the base pedal
to release rotating lock (Fig. 21). Place hands on the main frame (Fig. 22) and swivel
the umbrella frame in either direction until desired position is reached (Fig. 23). Step
off the foot pedal to engage rotating lock and lock position (you will hear the pedal
click, as it reaches the next available lock position).
Rotating Features
S T E P 1 Base Assembly
Select area to set base and place in desired location. NOTE: Moving the umbrella will
be difficult once fully assembled. Remove inverted plate from inverted base stem
(Fig. 1). Remove the inverted base stem by using the steel wrench (provided) turning
counter-clockwise
(Fig. 2), now remove base lid from base shell (Fig. 3).
Return inverted base stem to base shell, to keep sand out of base stem channels.
(Fig. 4) IMPORTANT: Do not allow sand to spill inside the base stem channels, as it
will impede further installation. Now, fill each section of the base shell with dry
playground sand (Fig. 5). The base holds up to 200 lbs. of sand. NOTE: Base weight
will be 250 lbs. after sand is added. Now, remove inverted base stem (Fig. 6) from
base shell. Place base lid back onto base shell and re-install the inverted base stem
(Fig. 7). IMPORTANT: Carefully, as you tighten the inverted base stem, you will notice
clicking/ratcheting sound. Please make sure it is between CLICKS.
Do not over
tighten inverted base stem or parts may be damaged.
(Fig. 1)
(Fig. 2)
(Fig. 3)
(Fig. 4)
(Fig. 5)
(Fig. 6)
Steel
Wrench
Base
Stem
Channels
(Fig. 7)