Summary of Contents for Smart Meter 50kA-3

Page 1: ...rced from certified sustainable forests FSC Perfect Charging Perfect Welding Solar Energy Fronius Smart Meter 50kA 3 EN Operating instructions PV system monitoring 42 0426 0280 EN 006 19082020 www you...

Page 2: ......

Page 3: ...r current transformer 11 Connecting the current transformers 12 Suitable voltage transformers 12 Connecting the data communication cable to the inverter 12 Terminating resistors 13 Setting the transfo...

Page 4: ...there is a danger of Injury or death to the operator or a third party Damage to the device and other material assets belonging to the operating company Any safety devices that are not fully functional...

Page 5: ...hanged immediately Copyright Copyright of these operating instructions remains with the manufacturer The text and illustrations are all technically correct at the time of printing We reserve the right...

Page 6: ...w of your own electricity consumption The meter measures the power flow to the loads or the grid and forwards the information to the Fronius Datamanager via ModBus RTU RS485 interface CAUTION Observe...

Page 7: ...led in an environmentally responsible manner Ensure that you return your used device to your dealer or obtain information regarding a local authorised collection and disposal system Failure to comply...

Page 8: ...resistors on page 13 11 Tug on each wire and plug to make sure that they are securely connected to the ter minal blocks 12 Switch on the power supply to the Fronius Smart Meter 13 Check the firmware...

Page 9: ...s marked L1 L2 and L3 In rare cases the neutral conductor has an overcurrent protection which must simul taneously interrupt neutral and unearthed lines Cabling Always switch off the power supply befo...

Page 10: ...10...

Page 11: ...the current transformer must be greater than the sum of the power of the Fronius Smart Meter and the leads The higher the power the better Line resistances at different cross sections copper wires Se...

Page 12: ...Smart Meter Always switch off the power supply before disconnecting live conductors The current transformers are connected to connections 1 and 3 4 and 6 7 and 9 If necessary excessively long cables c...

Page 13: ...o the mains cabling use wires or cables that are designed for 300 to 600 V never less than the operating voltage Use double insulated or sheathed output cables when they are close to bare con ductors...

Page 14: ...he trans formation ratio of the current and voltage trans formers on the Smart Meter Only the transformation ratio of the current and voltage transformers must be set All other parameters have already...

Page 15: ...r kilowatt hours of energy sourced from the grid and energy fed into the grid Based on the relevant billing data the electricity retailer will invoice the energy sourced from the grid and the purchase...

Page 16: ...being installed a separate address see Setting the address of the Fronius Smart Meter page 17 must be set for each one The primary meter always has address 1 all other meters are numbered in the addre...

Page 17: ...The remaining Modbus nodes must be distributed equally Setting the address of the Fronius Smart Meter Symbol Name Event Function Prog 1 x Increases the set value Page 1 x Moves the cursor Enter 1 x co...

Page 18: ...Connect to the Fronius Datamanager via access point 1 Activate the access point on the Datamanager 2 Connect to the Fronius_240 XXXXXX network 3 Go to the Fronius Datamanager website Open IP address h...

Page 19: ...OK when the status OK is displayed If the Timeout status is displayed repeat the procedure 9 Click on the checkmark in the upper right corner to save the settings 10 The Fronius Smart Meter is fully...

Page 20: ...Operation Menu structure A graphic view of the menu structure can be found in the User Information that is sup plied as standard 20...

Page 21: ...x 6 A Starting current 20 mA Current transformer ratio kCT 1 9 999 e g TC 800 5A kCT 160 For direct connection kCT 1 Short time overload EN IEC 62053 21 EN IEC 62053 23 20 lmax 0 5 s Self consumption...

Page 22: ...e effective power Programmable values 0 10 to 50 Pn 3 phase effective power In acc with 400 V 5 A 3464 W Operating hours counter reset Accessible via keypad or locked Output Energy pulse Pulse output...

Page 23: ...23 C 2 C Operating range 5 to 55 C Temperature limit for storage and trans port 25 to 70 C Tropical model Max power loss for thermal dimensioning of the switch cabinet 2 8 W Housing Housing 4 modules...

Page 24: ...tailed country specific warranty terms are available on the internet www fronius com solar warranty To obtain the full warranty period for your newly installed Fronius inverter or storage sys tem plea...

Page 25: ...25 EN...

Page 26: ...26...

Page 27: ...27 EN...

Page 28: ...INTERNATIONAL GMBH Froniusstra e 1 A 4643 Pettenbach AUSTRIA contact fronius com www fronius com Under www fronius com contact you will find the addresses of all Fronius Sales Service Partners and lo...