The inverter does not need to be configured after connecting the Rapid Shut-
down Box. If settings have already been made regarding energy management,
check this section in the inverter Operating Instructions. The energy manager
(relay mode) must be set to 'ON' (factory setting).
3
2
1
Signal A
Signal B
put sticker on inverter
PH
O
T
O
VO
L
T
AI
C
R
API
D
SH
U
T
D
O
W
N
SYST
EM
EQ
U
IPMEN
T
Connecting the
Rapid Shutdown
Box to GEN24
Inverter
If the AC supply is interrupted, the inverter disconnects the PV DC supply via
the Rapid Shutdown Box. As soon as the AC supply is reinstated, the DC supply
will resume.
The signal relay in the Fronius inverter opens if the inverter loses the AC connec-
tion. The Rapid Shutdown Box interrupts the DC connection.
However, the signal
relay can no longer be used for other functions (energy manager, alarm, etc.)
if
the rapid shutdown initiation is to be triggered by an AC failure on the inverter.
The inverter does not need to be configured after connecting the Rapid Shut-
down Box. If settings have already been made regarding energy management,
check this section in the inverter Operating Instructions. The energy manager
(relay mode) must be set to 'ON' (factory setting).
18
Summary of Contents for Rapid Shutdown Box Duo
Page 2: ......
Page 13: ...Attaching the Rapid Shutdown Box to the wall 1 2 3 Fasteners not included 4 5 13 EN US...
Page 14: ...Connecting the Rapid Shutdown Box Wiring of the Rapid Shutdown Box Duo 1 2 3 8 10 4 5 6 14...
Page 24: ...24...
Page 35: ...Montage de la Rapid Shutdown Box sur le mur 1 2 3 Mat riel de fixation non inclus 4 5 35 FR...
Page 36: ...Raccorder la Rapid Shutdown Box C bler la Rapid Shutdown Box Duo 1 2 3 8 10 4 5 6 36...
Page 46: ...Raccordement de 5 cha nes de modules solaires au Fronius Primo GEN24 208 240 46...
Page 57: ...Fijar la Caja de cierre r pido a la pared 1 2 3 No se incluyen los sujetadores 4 5 57 ES MX...
Page 69: ...69 ES MX...
Page 70: ...70...
Page 71: ...71 ES MX...
Page 72: ......