![Fronius Primo GEN24 3.0 Operating Instructions Manual Download Page 11](http://html1.mh-extra.com/html/fronius/primo-gen24-3-0/primo-gen24-3-0_operating-instructions-manual_2339204011.webp)
voltage. The simultaneous operation of electronic devices in the same backup
power supply system should be avoided.
IMPORTANT!
The inverter may only be operated within the limits of its technical capabilities.
Operation outside of its technical capabilities can cause the inverter to shut
down.
Data protection
The user is responsible for the safekeeping of any changes made to the factory
settings. The manufacturer accepts no liability for any deleted personal settings.
Copyright
Copyright of these operating instructions remains with the manufacturer.
The text and illustrations are all technically correct at the time of printing. We
reserve the right to make changes. The contents of the operating instructions
shall not provide the basis for any claims whatsoever on the part of the pur-
chaser. If you have any suggestions for improvement, or can point out any mis-
takes that you have found in the instructions, we will be most grateful for your
comments.
Protective
earthing (PE)
Connection of a point in the device, system or installation to earth to protect
against electric shock in the event of a fault. When installing a safety class 1 in-
verter (see
), the ground conductor connection is required.
When connecting the ground conductor, ensure that it is secured against acci-
dental disconnection. All the points listed in the chapter
er to the public grid (AC side)
must be observed. It must be ensured
that when using the strain relief devices, the ground conductor is the last to be
disconnected in the event of a possible failure. When connecting the ground con-
ductor, the minimum cross-section requirements specified by the respective na-
tional standards and guidelines must be observed.
11
EN
Summary of Contents for Primo GEN24 3.0
Page 2: ......
Page 12: ...12...
Page 13: ...General information 13...
Page 14: ...14...
Page 34: ...34...
Page 35: ...Backup power variant PV Point OP 35...
Page 36: ...36...
Page 38: ...38...
Page 39: ...Backup power variant Full Backup 39...
Page 40: ...40...
Page 48: ...48...
Page 49: ...Installation 49...
Page 50: ...50...
Page 57: ...Do not install the inverter on the ceiling 57 EN...
Page 101: ...Settings user interface of the in verter 101...
Page 102: ...102...
Page 132: ...132...
Page 133: ...Options 133...
Page 134: ...134...
Page 144: ...144...
Page 145: ...Appendix 145...
Page 146: ...146...
Page 172: ...172...
Page 173: ...Circuit diagrams 173...
Page 174: ...174...
Page 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Page 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Page 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Page 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Page 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Page 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Page 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Page 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Page 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Page 187: ...Dimensions of the inverter 187...
Page 188: ...188...
Page 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Page 190: ...190...
Page 191: ...191 EN...
Page 192: ......