![Fronius Primo GEN24 3.0 Operating Instructions Manual Download Page 65](http://html1.mh-extra.com/html/fronius/primo-gen24-3-0/primo-gen24-3-0_operating-instructions-manual_2339204065.webp)
Connecting the inverter to the public grid (AC
side)
Safety
WARNING!
Danger due to incorrect operation and incorrectly performed work.
This can result in serious injury and damage to property.
▶
Read the Installation and Operating Instructions before installing and com-
missioning the equipment.
▶
Only qualified personnel are authorised to commission your inverter and only
within the scope of the respective technical regulations.
WARNING!
Danger due to grid voltage and DC voltage from solar modules that are exposed
to light.
An electric shock can be fatal.
▶
Prior to any connection work, disconnect the inverter on the AC side and the
DC side.
▶
Only an authorised electrical engineer is permitted to connect this equip-
ment to the public grid.
WARNING!
Danger due to damaged and/or contaminated terminals.
This can result in serious injury and damage to property.
▶
Before making any connections, check the terminals for damage and con-
tamination.
▶
Remove contamination in the de-energized state.
▶
Have defective terminals repaired by an authorised specialist.
IMPORTANT!
National standards and guidelines regarding load unbalance must be taken into
account. The inverter does not have a communication link and does not automat-
ically disconnect from the grid when the load unbalance is exceeded.
If the inverter is installed in Australia or New Zealand (required standard: AS/
NZS4777.2:2020), the inverter must not be used as part of a three-phase com-
bination, as there is no communication link between the inverters.
Connecting the
inverter to the
public grid (AC
side)
NOTE!
The neutral conductor must be connected in order to operate the inverter.
It is not possible to operate the inverter in unearthed grids, such as IT grids (in-
sulated grids without ground conductor).
▶
Make sure that the grid's neutral conductor is grounded.
IMPORTANT!
The ground conductor of the AC cable must be laid in such a way
that it is the last to be disconnected in the event that the strain-relief device
should fail.
This can be ensured by making it somewhat longer and by laying it in a loop.
65
EN
Summary of Contents for Primo GEN24 3.0
Page 2: ......
Page 12: ...12...
Page 13: ...General information 13...
Page 14: ...14...
Page 34: ...34...
Page 35: ...Backup power variant PV Point OP 35...
Page 36: ...36...
Page 38: ...38...
Page 39: ...Backup power variant Full Backup 39...
Page 40: ...40...
Page 48: ...48...
Page 49: ...Installation 49...
Page 50: ...50...
Page 57: ...Do not install the inverter on the ceiling 57 EN...
Page 101: ...Settings user interface of the in verter 101...
Page 102: ...102...
Page 132: ...132...
Page 133: ...Options 133...
Page 134: ...134...
Page 144: ...144...
Page 145: ...Appendix 145...
Page 146: ...146...
Page 172: ...172...
Page 173: ...Circuit diagrams 173...
Page 174: ...174...
Page 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Page 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Page 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Page 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Page 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Page 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Page 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Page 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Page 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Page 187: ...Dimensions of the inverter 187...
Page 188: ...188...
Page 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Page 190: ...190...
Page 191: ...191 EN...
Page 192: ......